Adani Electricity Mumbai Limited (AEML) Solar & Net Metering Guide

Everything you need to know about connecting rooftop solar to the AEML grid in Maharashtra. Understand capacity limits against your electricity meter, bi-directional meter testing requirements, and PM Surya Ghar subsidy processing.

Up to 100%

Sanctioned Load Limit

₹3.35

Export Feed-in Tariff

Net Metering

Regulator Settlement

Rooftop Solar Capacity Rules for AEML

Solar net metering allowed up to 100% of contract demand/sanctioned load as per MERC Rooftop Regulations.

Important Note on Transformer Limits: Under state SERC regulations, the total cumulative solar capacity connected to any local distribution transformer (DT) must not exceed 70%–80% of its rated kVA capacity. Early applicants in your neighborhood receive faster clearance before transformer saturation occurs.

Step-by-Step Net Metering Process with AEML

  1. 1

    Register on PM Surya Ghar portal using your 9-digit AEML Consumer Account Number (CA).

  2. 2

    AEML verifies distribution transformer saturation limit (must be <= 70% of DT rating).

  3. 3

    Selected vendor installs the system with grid-interactive inverter and AC/DC protection boxes.

  4. 4

    Bidirectional meter installed post technical verification by AEML testing team.

  5. 5

    Net billing / net metering integration completed on regular monthly bill.

Official Consumer Portal

https://www.adanielectricity.com

Visit AEML Portal ↗

Districts & Cities Served by AEML

Check local sunshine, verified installer quotes, and 3kW pricing for your district:

Frequently Asked Questions: AEML Solar

What is the maximum solar capacity allowed under AEML?

Under Adani Electricity Mumbai Limited (AEML), residential consumers can install rooftop solar up to 100% of their sanctioned load or contract demand, subject to transformer capacity limits.

Does AEML support the PM Surya Ghar subsidy?

Yes, Adani Electricity Mumbai Limited (AEML) is integrated with the PM Surya Ghar National Portal. Consumers can claim up to ₹78,000 central subsidy directly into their bank account.

How long does net meter installation take with AEML?

Typically 15 to 30 days following physical installation completion and submission of the work completion report by your empanelled vendor.

What is the export tariff rate under AEML?

Surplus solar units exported to AEML are credited at the state regulator-determined rate of approximately ₹3.35 per unit.