Solar Subsidy Calculator India: Eligibility & Estimate
Calculate your exact Central Financial Assistance (CFA) under PM Surya Ghar: Muft Bijli Yojana. Review official central subsidy slabs, state top-up schemes, net installation costs, and DISCOM net-metering requirements across India.
Select Your State & District
Electricity tariffs and state subsidy grants depend directly on your DISCOM and local solar irradiance.
Please select your state before proceeding
Consumer Category & Monthly Bill
Tell us what you know. Our engineering engine derives panel wattage, sun hours, and sizing behind the scenes.
Estimated monthly electricity usage: ~ units / month
Check your latest electricity bill for "Sanctioned Load" or "Connected Load" (typically 2 kW to 5 kW for residential homes).
Terrace Structure & System Preferences
Select your mounting structure to retain full terrace usability for walking and household activities.
Central & State Solar Subsidy Engine
MNRE National DBT Scheme & State Portals
Unlock Your Detailed Solar Report
Enter your 10-digit mobile number to view the itemized price breakdown, PM Surya Ghar subsidy deduction, and engineering report.
6-digit SMS code sent to: +91
Calculation based on MNRE PM Surya Ghar subsidy guidelines. By continuing, you agree to receive customized solar quotes.
Down from ₹ to basic DISCOM grid charges of ₹.
Total Turnkey - Subsidy .
Your recommended solar capacity ( kW) is higher than your current sanctioned load ( kW). Most DISCOMs require solar capacity to match or be lower than the sanctioned load. You can easily apply for a load enhancement online on your DISCOM portal.
Itemized Turnkey Cost Breakdown
MNRE BenchmarksSystem Size Comparison (2 kW vs 3 kW vs 5 kW)
← Swipe →| Capacity | Monthly Gen | Subsidy | Net Cost | Savings/Mo |
|---|---|---|---|---|
| Optimal | ~ units |
Get 3 Free Quotes from PM Surya Ghar Empanelled Installers
DISCOM-approved contractors in provide free physical site inspection, shadow feasibility report, and complete net-metering liaison.
Unlock Your Detailed Solar Report & Subsidy Breakdown Customize Your Rooftop Solar Preferences Enter 6-Digit SMS Verification Code
Enter your contact details to view itemized price breakdowns, PM Surya Ghar subsidy deductions, and engineering feasibility. Just a few quick technical details to generate your customized engineering feasibility report. 6-digit SMS verification code sent to: +91
Calculation based on MNRE PM Surya Ghar subsidy guidelines. By continuing, you agree to receive customized solar quotes.
This calculator provides an engineering estimate based on official Ministry of New and Renewable Energy (MNRE) guidelines. Actual Central Financial Assistance (CFA) is disbursed directly into your bank account via Direct Benefit Transfer (DBT) following National Portal registration, technical feasibility approval, installation by an empanelled vendor, and DISCOM net-meter inspection.
PM Surya Ghar Subsidy & Net Turnkey Cost by System Size (2026)
Official Central Financial Assistance (CFA) benchmark slabs, turnkey system costs, net out-of-pocket investment, and estimated electricity bill savings across residential capacities:
| System size | Central subsidy | Estimated Turnkey Cost | Net Cost to You | 550W Solar Panels | Roof Area | Monthly Savings | Annual Savings | Pricing Guide |
|---|---|---|---|---|---|---|---|---|
| 1 kW | ₹30,000 | ₹60,000 | ₹30,000 | 2 panels | 100 sq ft | ₹781/mo | ₹9,367/yr | 1 kW Price Guide |
| 2 kW | ₹60,000 | ₹1,14,000 | ₹54,000 | 4 panels | 200 sq ft | ₹1,561/mo | ₹18,733/yr | 2 kW Price Guide |
| 3 kW Most Popular | ₹78,000 | ₹1,65,000 | ₹87,000 | 6 panels | 300 sq ft | ₹2,342/mo | ₹28,100/yr | 3 kW Price Guide |
| 4 kW | ₹78,000 | ₹2,20,000 | ₹1,42,000 | 8 panels | 400 sq ft | ₹3,122/mo | ₹37,467/yr | — |
| 5 kW | ₹78,000 | ₹2,60,000 | ₹1,82,000 | 10 panels | 500 sq ft | ₹3,903/mo | ₹46,833/yr | 5 kW Price Guide |
| 10 kW | ₹78,000 | ₹5,00,000 | ₹4,22,000 | 19 panels | 1,000 sq ft | ₹7,806/mo | ₹93,666/yr | 10 kW Price Guide |
Residential PM Surya Ghar subsidy provides ₹30,000/kW for the first 2 kW and ₹18,000 for the 3rd kW (capped at ₹78,000 for 3 kW and larger). Turnkey costs reflect standard EPC market averages across India.
State-Wise Solar Subsidy Top-Up Schemes (2026)
Several state governments offer state top-up financial incentives in addition to the central PM Surya Ghar subsidy. Below is the verified state top-up data from our database:
| State | State Scheme | State Subsidy Incentive | Central Subsidy | Max Combined Subsidy | State Solar Guide |
|---|---|---|---|---|---|
| Assam | Assam State Rooftop Solar Scheme (APDCL) ₹15,000 for 1 kW, ₹30,000 for 2 kW, and ₹45,000 for 3 kW. Combined with Special Category Central CFA (₹85,800), total subsidy reaches ₹1,30,800. DISCOM: ASEB | Up to ₹45,000 (₹15,000/kW) | ₹78,000 (3 kW) | ₹1,23,000 | View State Guide |
| Bihar | Bihar State Rooftop Solar Top-Up Subsidy (BREDA) ₹10,000 per kW up to 2 kW (capped at ₹20,000). Total combined subsidy with Central is ₹40,000 for 1 kW, ₹80,000 for 2 kW, and ₹98,000 for 3 kW. DISCOM: NBPDCL, SBPDCL | Up to ₹20,000 (₹10,000/kW) | ₹78,000 (3 kW) | ₹98,000 | View State Guide |
| Chhattisgarh | CREDA Rooftop Solar State Subsidy ₹15,000 for 1 kW, and flat ₹30,000 for 2 kW and above. Combined total subsidy is ₹45,000 (1 kW), ₹90,000 (2 kW), and ₹1,08,000 (3 kW+). DISCOM: CSPDCL | Up to ₹30,000 | ₹78,000 (3 kW) | ₹1,08,000 | View State Guide |
| Delhi | Delhi Solar Policy 2024–2027 (Capital Subsidy + GBI) ₹10,000/kW upfront state capital subsidy (max ₹30,000, driving combined upfront subsidy to ₹1,08,000 for 3 kW) PLUS ₹3.00/unit Generation-Based Incentive (GBI) credited monthly for 5 years. DISCOM: BRPL, BYPL, TPDDL | Up to ₹30,000 (₹10,000/kW) | ₹78,000 (3 kW) | ₹1,08,000 | View State Guide |
| Goa | Goa Grid-Connected Rooftop Solar Promotion Scheme 2026 (GEDA) State subsidy of up to 50% on benchmark cost for residential systems up to 10 kWp (~₹15,000/kW up to ₹45,000 for 3 kW). Total subsidy up to ₹1,23,000. DISCOM: CSEZ | Up to ₹45,000 (₹15,000/kW) | ₹78,000 (3 kW) | ₹1,23,000 | View State Guide |
| Gujarat | Surya Gujarat Yojana ₹10,000/kW up to 2 kW. Max state subsidy ₹20,000. Combined with Central, total subsidy is up to ₹98,000 for a 3 kW system. DISCOM: UGVCL, DGVCL, MGVCL | Up to ₹20,000 (₹10,000/kW) | ₹78,000 (3 kW) | ₹98,000 | View State Guide |
| Jammu and Kashmir | JAKEDA UT Rooftop Solar Subsidy ₹3,000 per kW UT top-up (up to ₹9,000 for 3 kW). Combined with Special Category Central CFA (₹85,800), total subsidy reaches ₹94,800. DISCOM: JKSPDCL | Up to ₹9,000 (₹3,000/kW) | ₹78,000 (3 kW) | ₹87,000 | View State Guide |
| Ladakh | Ladakh UT Solar Subsidy (LREDA) ₹20,000/kW state subsidy (capped at ₹50,000). Combined with Special Category Central CFA (₹85,800), total subsidy reaches ₹1,35,800. DISCOM: LADPCL | Up to ₹50,000 (₹20,000/kW) | ₹78,000 (3 kW) | ₹1,28,000 | View State Guide |
| Odisha | Odisha Akshaya Shakti Bikash Yojana (OASBY / OREDA) ₹25,000 for 1 kW, ₹50,000 for 2 kW, and up to ₹60,000 for 3 kW. Combined subsidy reaches up to ₹1,38,000. DISCOM: CESU, NESCO | Up to ₹60,000 | ₹78,000 (3 kW) | ₹1,38,000 | View State Guide |
| Puducherry | Puducherry UT Rooftop Solar Top-Up Scheme ₹9,000 per kW UT top-up subsidy (up to ₹27,000 for 3 kW). Combined with Central subsidy, total reaches up to ₹1,05,000. DISCOM: PED | Up to ₹27,000 (₹9,000/kW) | ₹78,000 (3 kW) | ₹1,05,000 | View State Guide |
| Rajasthan | Mukhyamantri Nishulk Bijli Yojana Solar Top-Up ₹17,000 targeted state top-up. Combined with Central, total subsidy up to ₹95,000 for 3 kW. DISCOM: JVVNL, JDVVNL | Up to ₹17,000 | ₹78,000 (3 kW) | ₹95,000 | View State Guide |
| Tamil Nadu | Tamil Nadu State Solar Top-Up Scheme (TNGECL / TEDA) ₹5,000 for 1 kW, ₹10,000 for 2 kW, and ₹22,000 for 3 kW and above. Combined with PM Surya Ghar, total subsidy reaches ₹1,00,000. DISCOM: TANGEDCO | Up to ₹22,000 | ₹78,000 (3 kW) | ₹1,00,000 | View State Guide |
| Uttar Pradesh | UP State Solar Policy Top-Up Subsidy (UPNEDA) ₹15,000/kW up to 2 kW. Max state subsidy ₹30,000. Combined with Central (₹78,000 for 3 kW), total subsidy is up to ₹1,08,000. DISCOM: DVVNL, MVVNL, PVVNL | Up to ₹30,000 (₹15,000/kW) | ₹78,000 (3 kW) | ₹1,08,000 | View State Guide |
| West Bengal | WBSEDCL State Rooftop Solar Top-Up Scheme ₹5,000 for 1 kW, ₹10,000 for 2 kW, and ₹15,000 for 3 kW+. Combined subsidy up to ₹93,000 (Plus additional ₹15,000 grant for SC/ST consumers). DISCOM: WBSEDCL, CESC | Up to ₹15,000 (₹5,000/kW) | ₹78,000 (3 kW) | ₹93,000 | View State Guide |
State top-up subsidies are released through state renewable energy development agencies (such as UPNEDA, GUVNL, or CREDA) or credited on monthly DISCOM electricity bills (e.g. Delhi GBI).
PM Surya Ghar Concessional Bank Loans & EMI Rates (2026)
Under the PM Surya Ghar scheme, leading public sector banks offer collateral-free solar rooftop loans at concessional interest rates starting from 7.00% p.a. for tenures up to 10 years (120 months) for residential systems up to 3 kW:
| Bank / Financial Institution | Interest Rate (p.a.) | Max Tenure | Est. Monthly EMI per ₹1 Lakh | Est. Monthly EMI for 3 kW Net Cost |
|---|---|---|---|---|
| SBI (Surya Ghar Loan) | 7% p.a. | 10 Years (120 mos) | ₹₹1,161/mo | ₹₹1,010/mo |
| Bank of Baroda | 7.15% p.a. | 10 Years (120 mos) | ₹₹1,169/mo | ₹₹1,017/mo |
| Punjab National Bank | 7.25% p.a. | 10 Years (120 mos) | ₹₹1,174/mo | ₹₹1,021/mo |
| Canara Bank | 7.3% p.a. | 10 Years (120 mos) | ₹₹1,177/mo | ₹₹1,024/mo |
| Union Bank of India | 7.4% p.a. | 10 Years (120 mos) | ₹₹1,182/mo | ₹₹1,028/mo |
| HDFC Bank | 8.5% p.a. | 5 Years (120 mos) | ₹₹2,052/mo | ₹₹1,785/mo |
Financial Cashflow Advantage: A typical 3 kW system saves approximately ₹2,100 monthly in grid electricity charges, while the 10-year bank loan EMI is only ~₹1,150 to ₹1,200. The solar system delivers net surplus cash flow from month one.
Direct Benefit Transfer (DBT) & Inspection Process
The subsidy under PM Surya Ghar is not an upfront discount by your vendor. It is deposited directly into your bank account through this verified 5-stage verification procedure:
DISCOM Technical Feasibility Approval: Your local electricity distribution company verifies your sanctioned load and ensures the local distribution transformer has adequate hosting capacity.
ALMM-Compliant Installation: Your chosen installer procures domestic content solar modules listed on the MNRE Approved List of Models and Manufacturers (ALMM) and grid-tied inverters.
Net Meter Installation: DISCOM engineers inspect the physical installation, verify grounding/earthing and dual-isolation switch, and replace your regular meter with a bi-directional net meter.
Commissioning Certificate: After synchronization with the electricity grid, the DISCOM generates and uploads the signed commissioning certificate to the National Portal.
Direct Bank Credit: MNRE disburses the Central Financial Assistance (CFA) directly into the applicant's Aadhaar-seeded bank account within 30 to 45 days after the commissioning report is approved.
Solar Subsidy for Housing Societies & RWAs
Resident Welfare Associations (RWAs) and Group Housing Societies (GHS) are eligible for Central Financial Assistance of ₹18,000 per kW up to a maximum capacity of 500 kW (inclusive of individual residential rooftop installations within the society). This subsidy applies specifically to common service meters supplying power for elevators, common staircase and campus lighting, water pumping installations, and shared electric vehicle (EV) charging bays.
Tax Benefits for Commercial & Industrial Solar
Commercial, institutional, and industrial electricity connections do not receive central cash subsidies under PM Surya Ghar. However, businesses can claim 40% Accelerated Depreciation under Section 32 of the Income Tax Act in the first year of operation, alongside GST input tax credit. With typical commercial electricity tariffs ranging between ₹8 and ₹12 per unit, commercial rooftop solar projects usually achieve full payback within 3 to 4 years.
Eligibility checklist
To qualify for Central Financial Assistance under PM-Surya Ghar, applicants must meet these criteria:
- Residential electricity consumer with an active domestic connection and electricity bill in your name.
- System capacity between 1 kW and 10 kW (residential); housing societies up to 500 kW.
- Installation must be done on a residential rooftop, terrace, or balcony with clear structural stability.
- Procurement and installation must be carried out through an MNRE-empanelled solar vendor.
- Solar panels and inverters must comply with ALMM (Approved List of Models and Manufacturers) domestic content requirements.
- Applicant must not have previously claimed central subsidy for the same electricity consumer connection.
- Net metering approval and grid synchronization must be completed with your local DISCOM.
How to apply
Follow this standard 6-step National Portal workflow to register and claim your subsidy:
- 1. Register on the national PM Surya Ghar portal (pmsuryaghar.gov.in) with your state, DISCOM, electricity consumer number, mobile, and email.
- 2. Apply for rooftop solar and obtain technical feasibility approval from your local DISCOM.
- 3. Choose an MNRE-empanelled vendor in your district and sign an agreement for installation.
- 4. Installer completes installation using ALMM-approved domestic content solar modules and inverters.
- 5. Submit completion details; DISCOM conducts site inspection and installs the bi-directional net meter.
- 6. Commissioning certificate is issued; enter your bank account details on the portal to receive direct benefit transfer (DBT) within ~30 days.
Documents You Will Need
Keep these documents ready for portal registration and DISCOM net-metering processing:
- Latest electricity bill showing consumer account number and active domestic tariff category.
- Proof of identity & address (Aadhaar card of the electricity account holder).
- Bank account passbook or cancelled cheque (must match applicant name for direct benefit transfer).
- Rooftop ownership proof or consent letter if common terrace / housing society.
- Photograph of installed rooftop solar plant with the applicant.
- Commissioning report signed by the empanelled installer and DISCOM official.
Does Solar Subsidy Differ by State?
Central Financial Assistance benchmark costs are structured into General and Special Category States/UTs. In addition, certain states offer state top-up subsidies credited over and above the central PM Surya Ghar amount.
Official Government Sources & Guidelines
Assumptions used Rates updated: 18 Nov 2026
- Central subsidy: ₹30,000/kW for the first 2 kW (60% benchmark) + ₹18,000 for the 3rd kW (40% benchmark), capped at ₹78,000 (residential).
- Capacities beyond 3 kW receive the same ₹78,000 central CFA — no additional central subsidy applies to residential systems > 3 kW.
- Housing societies: ₹18,000/kW up to a combined capacity of 500 kW for common-area services (lighting, lifts, water pumps).
- Commercial and industrial connections do not receive residential PM Surya Ghar CFA.
- State top-ups, where enacted, are evaluated from state renewable policy data.
Explore More Solar Calculators
Solar Panel Cost Calculator
Full price and net cost breakdown with live pricing.
Solar Panel Calculator
Calculate how many solar panels and what system size you need.
Solar ROI Calculator
Payback period and 25-year return after subsidy.
Solar Loan EMI Calculator
Finance the remaining net cost across top banks.
PM Surya Ghar Yojana Calculator
Scheme-branded eligibility wizard and documentation steps.
Net Metering Calculator
State-wise net metering units export and bill credit savings.
Explore Rooftop Solar by State & City
Calibrated with state Discom tariffs, local net-metering policies, and PM Surya Ghar subsidies across India.
Browse Solar Guides by State
Top Solar MarketsFrequently asked questions
How much solar subsidy can I get in India under PM Surya Ghar?
Under PM Surya Ghar, residential consumers receive ₹30,000 per kW for the first 2 kW (60% of benchmark cost) and ₹18,000 for the 3rd kW (40% of benchmark cost). The maximum central subsidy is ₹78,000 for a 3 kW or larger system.
What is the solar subsidy for a 1 kW solar system?
For an eligible 1 kW residential rooftop system, the central PM Surya Ghar subsidy is ₹30,000 (60% of the ₹50,000 benchmark cost).
What is the solar subsidy for a 2 kW solar system?
For an eligible 2 kW residential rooftop system, the central PM Surya Ghar subsidy is ₹60,000 (₹30,000 per kW for the first 2 kW).
What is the solar subsidy for a 3 kW solar system?
For an eligible 3 kW residential rooftop system, the total central subsidy is ₹78,000 (₹60,000 for the first 2 kW + ₹18,000 for the 3rd kW). This represents the maximum central subsidy available for residential consumers.
Do I get more subsidy for a 5 kW solar system?
No. Under the PM Surya Ghar residential framework, central CFA is capped at 3 kW. A 5 kW system receives the same maximum ₹78,000 central subsidy as a 3 kW system. The remaining 2 kW capacity is installed at full cost.
Who is eligible for PM Surya Ghar subsidy?
Eligible applicants must be residential electricity consumers with a domestic connection in their name, install an unshaded rooftop solar plant through an MNRE-empanelled vendor, use ALMM-compliant domestic content panels, and complete net metering with their local DISCOM.
Is PM Surya Ghar subsidy available for commercial properties?
No, PM Surya Ghar is strictly a residential scheme. Commercial and industrial establishments cannot claim central CFA. However, businesses can claim 40% accelerated depreciation on solar assets under Section 32 of the Income Tax Act.
Does the subsidy reduce the installer's quoted price directly?
The subsidy is not deducted upfront from the contractor's bill. You pay the installer for the system according to your milestone contract, and the Central Financial Assistance is credited directly to your bank account via Direct Benefit Transfer (DBT) after DISCOM commissioning.
How long does it take to receive the subsidy in my bank account?
Once your local DISCOM conducts the physical inspection, installs the bi-directional net meter, and issues the online commissioning certificate, the subsidy is typically disbursed within 30 to 45 days into the bank account linked on the National Portal.
Does my state provide an additional solar subsidy on top of central CFA?
Yes, select states (such as Uttar Pradesh, Gujarat, and Delhi) have announced state top-up incentives. Our calculator checks whether your state has an active top-up and displays it alongside the central PM Surya Ghar amount.
Do housing societies get the same subsidy as individual homes?
Resident Welfare Associations (RWAs) and Group Housing Societies (GHS) get ₹18,000 per kW up to a maximum combined capacity of 500 kW (at 10 kW per house) for common facilities like elevators, stairwell lighting, and water pumps.
Is this an official government calculator?
No. FreeSolarCalculator.in is an independent planning portal. We calculate estimates based on publicly published MNRE notifications. For official registration, application processing, and subsidy claims, always visit pmsuryaghar.gov.in.
How and when is the solar subsidy paid into the bank account?
The subsidy is credited via Direct Benefit Transfer (DBT) directly into the applicant's Aadhaar-seeded bank account within 30 days after the DISCOM commissions the net meter and uploads the approval certificate.
Can state solar subsidies be combined with PM Surya Ghar central subsidies?
Yes. States such as Uttar Pradesh, Rajasthan, and Delhi offer additional state top-up subsidies that can be combined with the central PM Surya Ghar subsidy to further reduce the homeowner's net capital outlay.