Bangalore Electricity Supply Company Limited (BESCOM) Solar & Net Metering Guide
Everything you need to know about connecting rooftop solar to the BESCOM grid in Karnataka. Understand capacity limits against your electricity meter, bi-directional meter testing requirements, and PM Surya Ghar subsidy processing.
Up to 100%
Sanctioned Load Limit
₹3.56
Export Feed-in Tariff
Net Metering
Regulator Settlement
Rooftop Solar Capacity Rules for BESCOM
Capacity allowed up to 100% of sanctioned connected load. Requires bi-directional meter testing by BESCOM lab.
Step-by-Step Net Metering Process with BESCOM
-
1
Register on the PM Surya Ghar National Portal and enter your 10-digit BESCOM Account ID.
-
2
Submit technical feasibility request on the BESCOM rooftop solar module.
-
3
Select an empanelled vendor and complete physical installation with DCR-compliant ALMM modules.
-
4
BESCOM field officer conducts site inspection and approves bi-directional net meter installation.
-
5
Joint commissioning certificate (JCC) generated; consumer starts earning grid export credits on monthly bill.
Official Consumer Portal
https://bescom.karnataka.gov.in
Districts & Cities Served by BESCOM
Check local sunshine, verified installer quotes, and 3kW pricing for your district:
Frequently Asked Questions: BESCOM Solar
What is the maximum solar capacity allowed under BESCOM?
Under Bangalore Electricity Supply Company Limited (BESCOM), residential consumers can install rooftop solar up to 100% of their sanctioned load or contract demand, subject to transformer capacity limits.
Does BESCOM support the PM Surya Ghar subsidy?
Yes, Bangalore Electricity Supply Company Limited (BESCOM) is integrated with the PM Surya Ghar National Portal. Consumers can claim up to ₹78,000 central subsidy directly into their bank account.
How long does net meter installation take with BESCOM?
Typically 15 to 30 days following physical installation completion and submission of the work completion report by your empanelled vendor.
What is the export tariff rate under BESCOM?
Surplus solar units exported to BESCOM are credited at the state regulator-determined rate of approximately ₹3.56 per unit.