Official Electricity Utility Guide (2026)

Tata Power Company Ltd (Mumbai Distribution) Solar & Net Metering Guide

Everything you need to know about connecting rooftop solar to the TPC grid in Maharashtra. Understand capacity limits against your electricity meter, bi-directional meter testing requirements, and PM Surya Ghar subsidy processing.

Up to 100%

Sanctioned Load Limit

₹3.35

Export Feed-in Tariff

Net Metering

Regulator Settlement

Rooftop Solar Capacity Rules for TPC

Net metering permitted up to 100% of sanctioned load under MERC regulations. High reliability grid banking.

Important Note on Transformer Limits: Under state SERC regulations, the total cumulative solar capacity connected to any local distribution transformer (DT) must not exceed 70%–80% of its rated kVA capacity. Early applicants in your neighborhood receive faster clearance before transformer saturation occurs.

Step-by-Step Net Metering Process with TPC

  1. 1

    Register on the PM Surya Ghar National Portal with your Tata Power 12-digit Consumer Number.

  2. 2

    Tata Power validates transformer capacity within 15 working days.

  3. 3

    Installation executed by an empanelled solar vendor using Tier-1 components.

  4. 4

    Safety inspection and installation of bidirectional smart meter by Tata Power testing team.

  5. 5

    Commissioning letter issued; solar generation offsets peak commercial and domestic tariffs.

Official Consumer Portal

https://www.tatapower.com

Visit TPC Portal ↗

Districts & Cities Served by TPC

Check local sunshine, verified installer quotes, and 3kW pricing for your district:

Frequently Asked Questions: TPC Solar

What is the maximum solar capacity allowed under TPC?

Under Tata Power Company Ltd (Mumbai Distribution), residential consumers can install rooftop solar up to 100% of their sanctioned load or contract demand, subject to transformer capacity limits.

Does TPC support the PM Surya Ghar subsidy?

Yes, Tata Power Company Ltd (Mumbai Distribution) is integrated with the PM Surya Ghar National Portal. Consumers can claim up to ₹78,000 central subsidy directly into their bank account.

How long does net meter installation take with TPC?

Typically 15 to 30 days following physical installation completion and submission of the work completion report by your empanelled vendor.

What is the export tariff rate under TPC?

Surplus solar units exported to TPC are credited at the state regulator-determined rate of approximately ₹3.35 per unit.