Official Electricity Utility Guide (2026)

Torrent Power Limited (Ahmedabad, Gandhinagar & Surat) Solar & Net Metering Guide

Everything you need to know about connecting rooftop solar to the Torrent grid in Gujarat. Understand capacity limits against your electricity meter, bi-directional meter testing requirements, and PM Surya Ghar subsidy processing.

Up to 100%

Sanctioned Load Limit

₹2.25

Export Feed-in Tariff

Net Metering

Regulator Settlement

Rooftop Solar Capacity Rules for Torrent

Net metering under GERC regulations. Capacity allowed up to 100% of sanctioned load.

Important Note on Transformer Limits: Under state SERC regulations, the total cumulative solar capacity connected to any local distribution transformer (DT) must not exceed 70%–80% of its rated kVA capacity. Early applicants in your neighborhood receive faster clearance before transformer saturation occurs.

Step-by-Step Net Metering Process with Torrent

  1. 1

    Register on PM Surya Ghar National Portal with your 10-digit Torrent Power Service Number.

  2. 2

    Feasibility review cleared digitally by Torrent Power technical team.

  3. 3

    Installation of ALMM panels and dual-MPPT grid-tied inverter by certified EPC.

  4. 4

    Torrent Power inspection team installs bi-directional energy meter and conducts anti-islanding test.

  5. 5

    Solar net metering activated on customer account within 15 days of commissioning.

Official Consumer Portal

https://www.torrentpower.com

Visit Torrent Portal ↗

Districts & Cities Served by Torrent

Check local sunshine, verified installer quotes, and 3kW pricing for your district:

Frequently Asked Questions: Torrent Solar

What is the maximum solar capacity allowed under Torrent?

Under Torrent Power Limited (Ahmedabad, Gandhinagar & Surat), residential consumers can install rooftop solar up to 100% of their sanctioned load or contract demand, subject to transformer capacity limits.

Does Torrent support the PM Surya Ghar subsidy?

Yes, Torrent Power Limited (Ahmedabad, Gandhinagar & Surat) is integrated with the PM Surya Ghar National Portal. Consumers can claim up to ₹78,000 central subsidy directly into their bank account.

How long does net meter installation take with Torrent?

Typically 15 to 30 days following physical installation completion and submission of the work completion report by your empanelled vendor.

What is the export tariff rate under Torrent?

Surplus solar units exported to Torrent are credited at the state regulator-determined rate of approximately ₹2.25 per unit.