Official Electricity Utility Guide (2026)

Madhyanchal Vidyut Vitran Nigam Ltd (UPPCL) Solar & Net Metering Guide

Everything you need to know about connecting rooftop solar to the MVVNL grid in Uttar Pradesh. Understand capacity limits against your electricity meter, bi-directional meter testing requirements, and PM Surya Ghar subsidy processing.

Up to 100%

Sanctioned Load Limit

₹2.80

Export Feed-in Tariff

Net Metering

Regulator Settlement

Rooftop Solar Capacity Rules for MVVNL

Solar system capacity permissible up to 100% of sanctioned load. Eligible for extra ₹30,000 UP State Top-Up Subsidy.

Important Note on Transformer Limits: Under state SERC regulations, the total cumulative solar capacity connected to any local distribution transformer (DT) must not exceed 70%–80% of its rated kVA capacity. Early applicants in your neighborhood receive faster clearance before transformer saturation occurs.

Step-by-Step Net Metering Process with MVVNL

  1. 1

    Apply on the PM Surya Ghar Portal using your 10-digit UPPCL Account ID.

  2. 2

    Choose an approved vendor from the UPPCL/UPNEDA empanelment roster.

  3. 3

    System installation completed; UPNEDA and MVVNL junior engineer conduct net meter inspection.

  4. 4

    Bi-directional meter synchronized with the UPPCL billing database.

  5. 5

    Claim combined ₹78,000 Central CFA + ₹30,000 UP State subsidy directly to your bank account.

Official Consumer Portal

https://www.mvvnl.in

Visit MVVNL Portal ↗

Districts & Cities Served by MVVNL

Check local sunshine, verified installer quotes, and 3kW pricing for your district:

Frequently Asked Questions: MVVNL Solar

What is the maximum solar capacity allowed under MVVNL?

Under Madhyanchal Vidyut Vitran Nigam Ltd (UPPCL), residential consumers can install rooftop solar up to 100% of their sanctioned load or contract demand, subject to transformer capacity limits.

Does MVVNL support the PM Surya Ghar subsidy?

Yes, Madhyanchal Vidyut Vitran Nigam Ltd (UPPCL) is integrated with the PM Surya Ghar National Portal. Consumers can claim up to ₹78,000 central subsidy directly into their bank account.

How long does net meter installation take with MVVNL?

Typically 15 to 30 days following physical installation completion and submission of the work completion report by your empanelled vendor.

What is the export tariff rate under MVVNL?

Surplus solar units exported to MVVNL are credited at the state regulator-determined rate of approximately ₹2.8 per unit.