OPEX vs CAPEX Solar: PPA & Ownership Calculator
Own the system, or sign a power purchase agreement and pay per unit with zero upfront cost? Both are common in India, and the right answer depends more on your balance sheet than on the underlying economics — this shows exactly where the two paths cross over a 25-year horizon.
OPEX (RESCO / PPA) vs CAPEX Comparator
25-Year Cumulative Cashflow & Financial Crossover Simulator
Enter your system size and the PPA rate on offer.
CAPEX vs OPEX over 25 years
CAPEX breaks even in
years
- CAPEX: total 25-year cost
- OPEX (PPA): total 25-year cost
- CAPEX advantage over 25 years
- Verdict
Want quotes for both models?
Compare offers from verified installers, both CAPEX and PPA — free, no obligation.
How this is calculated Rates updated: 18 Nov 2026
- CAPEX cost is the upfront system price plus 25 years of O&M, offset by subsidy where the consumer type is eligible.
- OPEX cost is 25 years of PPA payments at the offered rate, escalating at 3% per year — most PPAs include an annual escalation clause rather than a flat rate.
- CAPEX almost always wins on total 25-year cost since a PPA provider prices in their own return; OPEX's real advantage is zero upfront capital and zero maintenance responsibility, not lower total cost.
- Residential consumers are rarely offered PPAs in India — this comparison is most relevant for commercial and industrial consumers, where both models are commonly available.
Get Commercial Solar Feasibility & EPC Proposal Commercial Connection & Operating Profile Enter 6-Digit SMS Verification Code
Enter your company contact details to receive customized commercial solar ROI, payback schedule, and EPC proposals. Just a few quick technical details to generate your customized engineering feasibility report. 6-digit SMS verification code sent to: +91
Calculation based on MNRE PM Surya Ghar subsidy guidelines. By continuing, you agree to receive customized solar quotes.
Crossover Year by System Size
| System size | CAPEX breaks even in |
|---|---|
| 10 kW | 5 yrs |
| 25 kW | 5 yrs |
| 50 kW | 5 yrs |
| 100 kW | 6 yrs |
At a representative ₹6.50/unit PPA rate. Larger systems generally cross over faster because CAPEX cost per kW falls with scale while PPA rates do not.
Continue planning
Explore Rooftop Solar by State & City
Calibrated with state Discom tariffs, local net-metering policies, and PM Surya Ghar subsidies across India.
Browse Solar Guides by State
Top Solar MarketsFrequently asked questions
What is a solar PPA and how does it work in India?
A power purchase agreement lets a third-party developer install, own and maintain the solar system on your roof or premises at no cost to you, and you buy the electricity it generates at an agreed per-unit rate, usually below your grid tariff.
Is CAPEX or OPEX cheaper over the system life?
CAPEX is almost always cheaper in total, because a PPA rate is priced to cover the developer's capital cost plus their required return. OPEX's value is avoiding upfront capital and operational responsibility, not minimising total spend.
Why would a business choose a more expensive PPA over buying outright?
Cash flow and risk. A PPA needs no capital outlay, carries no maintenance liability, and often includes performance guarantees from the developer — attractive for businesses that would rather deploy capital elsewhere or avoid the operational burden of ownership.
Can residential consumers get a solar PPA in India?
Rarely — PPAs in the Indian rooftop market are overwhelmingly structured for commercial and industrial consumers with large enough loads and roof area to interest a developer. Residential rooftop is almost always a direct-purchase (CAPEX) market.
Does the PPA rate stay fixed for 25 years?
Usually not. Most Indian PPAs include an annual escalation clause, commonly 2–5%, so the per-unit rate rises over the contract term rather than staying flat — always check the escalation clause before comparing a quoted first-year rate to your grid tariff.
What happens to the system at the end of a PPA term?
Terms vary by contract — some PPAs transfer ownership to the consumer at end of term for a nominal or written-down value, others require the developer to remove the system or renegotiate. Confirm the end-of-term clause before signing, since it materially affects the total value of the deal.
What is the fundamental difference between CAPEX and OPEX (RESCO) solar models?
Under CAPEX, the customer purchases and owns the solar plant, gaining full electricity savings and 40% tax depreciation. Under OPEX/RESCO, a third-party investor builds and owns the plant, selling power to the customer at a discounted tariff.
Which model yields the highest long-term return on investment?
CAPEX delivers a substantially higher 25-year Internal Rate of Return (typically 20–28%) and overall savings, while OPEX is ideal for companies that cannot commit upfront capital or cannot utilize tax shields.
Who assumes operational and maintenance risk under an OPEX contract?
The RESCO developer assumes 100% performance, maintenance, and insurance risk under a Power Purchase Agreement (PPA), with guaranteed minimum generation covenants.