Solar System Comparison Calculator India

The cheaper quote is not always the cheaper system. A larger array at a higher price can produce more units for less per unit over 25 years. This calculator runs both quotes through the same engine and settles it with levelised cost — rupees per unit generated.

Quote A

Quote B

₹
kW

Solar System LCOE Comparison Engine

25-Year Levelized Cost of Energy & Tech Benchmark

%
1. Quote Specifications & Cell Tech Profiles Benchmarked
2. 25-Year Lifetime Degradation Yields Simulated
3. O&M and Inverter Replacement Expenses Modeled
4. Levelized Cost of Energy (₹/kWh) & Winner Verdict Finalized

Ready to Compare Solar Options

Configure both options above and click Compare to model 25-year LCOE, lifetime yield, and financial comparison.

How this is calculated Rates updated: 18 Nov 2026
  • Levelised cost = (quoted price + 25 years of O&M) ÷ total units generated over 25 years. Lower wins.
  • Generation uses your city's peak sun hours and each quote's cell technology, so a slower-degrading panel earns credit for the extra units it delivers.
  • O&M uses the stored cost per kW per year plus an inverter replacement reserve — a larger system costs more to maintain, which the comparison accounts for.
  • Prices are taken exactly as you enter them; the calculator does not adjust for subsidy, so enter both quotes on the same basis.

Levelised Cost by Price per kW

Price per kW Cost per unit
₹45,000 ₹1.99
₹55,000 ₹2.31
₹65,000 ₹2.64
₹75,000 ₹2.96

A 3 kW PERC system at national-average sun hours. Anything under ₹3 per unit beats grid tariffs comfortably.

Continue planning

Solar Panel Cost Calculator

A fair price benchmark before you compare.

→

Solar Panel Price List

Check what the panels alone should cost.

→

Solar ROI Calculator

Payback and 25-year return for the winner.

→
Regional Solar Hubs

Explore Rooftop Solar by State & City

Calibrated with state Discom tariffs, local net-metering policies, and PM Surya Ghar subsidies across India.

Frequently asked questions

What is levelised cost of energy and why does it matter?

It is total lifetime cost divided by total lifetime units generated — effectively what each unit of your own electricity costs you. It is the only fair way to compare systems that differ in both price and output, and the number to compare against your grid tariff.

Is the cheaper quote always the worse system?

No, and often it is simply cheaper. But a quote that is 15% cheaper while using panels that degrade faster and a smaller array can deliver noticeably fewer units over 25 years, making it more expensive per unit despite the lower sticker price.

What should I check beyond price when comparing quotes?

Panel and inverter warranty terms, whether the mounting structure is galvanised, whether net-metering paperwork is included, and who honours the service commitment. These rarely appear in the headline price but decide what the system costs you over its life.

Should I compare quotes before or after subsidy?

Always on the same basis — either both gross or both net. Subsidy is fixed by system size and central rules, not by installer, so it does not favour one quote over another. Mixing the two makes one quote look artificially cheap.

How much price variation is normal between installers?

A 10–20% spread across genuine quotes for the same size is common in India and reflects component quality and service. A quote more than 30% below the rest usually signals lower-tier components, an undersized structure, or costs that will appear later.

Does a bigger system always give a better cost per unit?

Usually yes, because fixed costs like the structure, labour and paperwork spread across more capacity. But subsidy caps at 3 kW, so the net-cost advantage of going larger weakens above that point even as the levelised cost keeps improving.

What is Levelized Cost of Electricity (LCOE) and how is it used to compare quotes?

LCOE measures the total lifetime cost of installing and maintaining a solar plant divided by its total 25-year energy production (₹/kWh). Lower LCOE indicates a superior investment.

Should I always choose the lowest turnkey price quotation?

Not necessarily. A slightly higher quote with Tier-1 N-Type TOPCon panels, dual MPPT inverters, and heavy-galvanized structures produces 10–15% more power over 25 years, yielding a lower LCOE.

How do I compare subsidized versus unsubsidized commercial quotes?

Always evaluate on a net out-of-pocket basis after deducting applicable subsidies, and factor in accelerated depreciation tax shields (40% Year 1) for commercial proposals.

Before you rely on this estimate

This calculator produces a planning range from your inputs and the assumptions shown on the page. It cannot replace a site visit, roof-shade survey, Discom approval or supplier quotation.

A calculator is not a quotation. A written quote should separately state the module and inverter model, mounting structure, protection equipment, taxes, net-metering work, warranty and completion timeline.

Next step: turn this result into a capacity, roof-space and budget decision.

Calculate system cost →