Solar Power Plant Cost Calculator: Project Estimates

From a 150 kW factory rooftop to a 5 MW ground-mount captive plant — EPC pricing, financing structure and off-take model all shift at this scale. Enter your capacity and off-take route to get investor-grade IRR, NPV and LCOE numbers.

₹
kW

Megawatt Project & Financial Yield Engine

Project IRR, 25-Year DCF Cashflow & LCOE Simulator

%
1. Applying tiered megawatt EPC scale rates & CAPEX...
2. Modeling 25-year generation decay & PPA escalation...
3. Computing Net Operating Income (NOI) after O&M costs...
4. Solving Project Equity IRR, 25-Year NPV & Levelized Cost (LCOE)...
How this is calculated Rates updated: 18 Nov 2026
  • EPC rate falls with scale: ₹45/W under 100 kW, ₹38/W from 100 kW to 1 MW, ₹32/W above 1 MW — larger projects get better equipment and installation pricing per watt.
  • PPA revenue escalates at a modest annual rate typical of long-term power contracts; captive revenue escalates with grid tariff inflation, which is usually higher.
  • IRR is solved by bisection over the full 25-year cash flow, so it does not depend on the 10% discount rate used for NPV — only the cash flows themselves.
  • Generation accounts for panel degradation year over year, using the same retention curve as every other calculator on this site.

IRR by Project Size

Capacity IRR LCOE (₹/unit)
100 kW 23.5% ₹1.64
500 kW 23.5% ₹1.64
1,000 kW 23.5% ₹1.64
5,000 kW 27.5% ₹1.45

At a representative PPA rate. Larger projects generally show a higher IRR because EPC cost per watt falls faster than revenue per watt.

Continue planning

Solar Project Feasibility Calculator

Full go/no-go analysis with your own cash flows.

→

OPEX vs CAPEX Solar Calculator

Compare owning outright against a PPA.

→

Solar Tender Bid Calculator

Price a competitive EPC bid for a project like this.

→
Regional Solar Hubs

Explore Rooftop Solar by State & City

Calibrated with state Discom tariffs, local net-metering policies, and PM Surya Ghar subsidies across India.

Frequently asked questions

What counts as a big solar project in India?

There is no single legal threshold, but projects above 100 kW typically move into commercial EPC pricing tiers, open-access eligibility, and more formal financing structures than a residential rooftop system.

Why does the EPC rate per watt fall as capacity rises?

Larger projects benefit from bulk equipment procurement, shared mobilisation and design costs spread over more capacity, and more competitive EPC bidding — the same reason bulk purchases are usually cheaper per unit.

What is the difference between a PPA and captive model at this scale?

Under a PPA, a developer sells the power generated to a buyer at an agreed per-unit rate. Under captive, the site owner builds and owns the plant to offset their own electricity purchase, usually at their higher commercial or industrial tariff.

Is open access relevant above 1 MW?

Yes — many states allow open-access power procurement above certain capacity and voltage thresholds, letting large consumers buy power directly from a generator rather than the local utility, which can materially change the economics versus a purely captive behind-the-meter model.

How is IRR different from a simple payback period?

Payback only tells you how long it takes to recover the initial investment, ignoring what happens after. IRR captures the full 25-year cash flow, including the time value of money, and is the standard metric investors and lenders use to compare projects.

Does this calculator account for financing and debt?

Not directly — it models unlevered, all-equity project economics. For a debt-financed structure, use the Solar Project Feasibility Calculator, which accepts a debt service figure to compute DSCR alongside IRR and NPV.

How much land is required to build a 1 MW ground-mounted solar project in India?

Modern utility-scale solar projects using high-wattage 550W+ bifacial modules require approximately 3.5 to 4.5 acres of contiguous land per 1 Megawatt (MW) capacity.

What grid evacuation infrastructure is needed for a megawatt-scale solar project?

MW plants require a dedicated step-up power transformer (e.g. 415V to 11 kV or 33 kV), bay extensions at the nearest DISCOM substation, and dedicated high-tension transmission lines.

What is the benchmark capital cost per MW for commercial solar farms in 2026?

Turnkey benchmark capital expenditure for ground-mounted megawatt solar projects in India ranges between ₹2.80 Crore and ₹3.40 Crore per MW depending on terrain and substation distance.

Before you rely on this estimate

This calculator produces a planning range from your inputs and the assumptions shown on the page. It cannot replace a site visit, roof-shade survey, Discom approval or supplier quotation.

A calculator is not a quotation. A written quote should separately state the module and inverter model, mounting structure, protection equipment, taxes, net-metering work, warranty and completion timeline.

Next step: validate the hourly load profile, demand charges and export assumptions—not only the annual bill.