Solarsquare
- State Installations
- 21,743
- State Capacity
- 87,185 kW
- District Footprint
- Solapur
- National Volume
- 48,536 installs
Complete engineering guide and financial blueprint for installing rooftop solar in Maharashtra. Discover current DISCOM electricity tariffs, PM Surya Ghar central subsidy amounts, state net metering rules, and calculate your exact out-of-pocket investment with our free interactive calculator.
Electricity tariffs in Maharashtra follow a progressive tiered slab structure. High electricity consumers pay steep per-unit rates, meaning a rooftop solar plant offsets the most expensive top-tier units first.
| Monthly Consumption Slab | Base Energy Charge | Effective Tariff (FAC + Duty) | Solar Savings Impact |
|---|---|---|---|
| 0 – 100 units | ₹4.71 / unit | ₹5.88 / unit | Lifeline domestic slab |
| 101 – 300 units | ₹8.88 / unit | ₹11.46 / unit | Typical urban household slab (high solar ROI) |
| 301 – 500 units | ₹12.01 / unit | ₹15.72 / unit | Air conditioning & heavy appliances |
| Above 501 units | ₹13.78 / unit | ₹18.10 / unit | Peak domestic tier; rooftop solar eliminates this first |
Unlike flat tariff systems, Maharashtra consumers with air conditioning or multiple appliances enter upper consumption tiers paying up to ₹18.10/unit.
Under net metering, rooftop solar eliminates your most expensive top-tier units first, delivering tax-free internal rate of return (IRR) exceeding 26% per annum.
Technical specifications, roof space requirements, PM Surya Ghar subsidy deductions, and estimated payback milestones for typical residential solar capacities in Maharashtra.
| System Size | Shadow-Free Roof | Monthly Generation | Est. Turnkey Cost | Combined Subsidy | Net Out-of-Pocket | Est. Monthly Savings | Payback |
|---|---|---|---|---|---|---|---|
| 1 kW Plant | 100 sq. ft. | ~117 units | ₹60,000 | ₹30,000 | ₹30,000 | ₹783 / mo | ~3.2 Years |
| 2 kW Plant | 200 sq. ft. | ~234 units | ₹1,14,000 | ₹60,000 | ₹54,000 | ₹2,124 / mo | ~2.1 Years |
| 3 kW Plant Most Popular | 300 sq. ft. | ~351 units | ₹1,65,000 | ₹78,000 | ₹87,000 | ₹3,682 / mo | ~2 Years |
| 4 kW Plant | 400 sq. ft. | ~465 units | ₹2,20,000 | ₹78,000 | ₹1,42,000 | ₹5,474 / mo | ~2.2 Years |
| 5 kW Plant | 500 sq. ft. | ~582 units | ₹2,60,000 | ₹78,000 | ₹1,82,000 | ₹7,508 / mo | ~2 Years |
| 8 kW Plant | 800 sq. ft. | ~933 units | ₹4,00,000 | ₹78,000 | ₹3,22,000 | ₹13,861 / mo | ~1.9 Years |
| 10 kW Plant | 1,000 sq. ft. | ~1,167 units | ₹5,00,000 | ₹78,000 | ₹4,22,000 | ₹18,097 / mo | ~1.9 Years |
Generation estimates reflect Maharashtra average solar insolation (5.0 PSH) using ALMM-compliant mono PERC/TOPCon modules at ₹8.80/unit tariff.
Estimate rooftop solar PV system sizing, gross turnkey expenditure, and net customer payable after PM Surya Ghar subsidy in Maharashtra.
Maharashtra DISCOM: Modeled using state benchmark tariff of ₹8.80/kWh and PM Surya Ghar 2026 central subsidy slabs.
Maharashtra Solar Cost Engine
State DISCOM Tariff & PM Surya Ghar Subsidy
Simulate Your Solar Sizing & Costs
Enter your monthly bill and click Calculate to view sized rooftop capacity, PM Surya Ghar central DBT, and net payable in Maharashtra.
Net Turnkey Payable (Post-Subsidy)
₹
Est. Monthly Bill Savings
₹/mo
Est. Payback:
Monthly Gen
~ units
Roof Area
~ sq ft
Solar Panels
panels
Get Quotes from Verified Maharashtra Installers
Free rooftop solar site inspection & quotation under PM Surya Ghar.
Homeowners in Maharashtra can claim the central PM Surya Ghar subsidy: ₹30,000 per kW for the first 2 kW, plus ₹18,000 for the third kW — up to ₹78,000 total for a 3 kW or larger residential system.
| System Capacity | Central PM Surya Ghar Subsidy | Maharashtra State Top-up | Max Combined Subsidy |
|---|---|---|---|
| 1 kW Rooftop Solar | ₹30,000 | Nil | ₹30,000 |
| 2 kW Rooftop Solar | ₹60,000 | Nil | ₹60,000 |
| 3 kW Rooftop Solar Standard Cap | ₹78,000 | Nil | ₹78,000 |
| 5 kW Rooftop Solar | ₹78,000 | Nil | ₹78,000 |
| 10 kW Rooftop Solar | ₹78,000 | Nil | ₹78,000 |
No additional state-level top-up subsidy is currently applicable in Maharashtra — residential installations receive the central PM Surya Ghar capital subsidy of up to ₹78,000.
Central and state subsidies are disbursed via Direct Benefit Transfer (DBT) directly into the homeowner's bank account following technical feasibility approval (TFA), system installation by an empanelled vendor, and net meter synchronization. Confirm latest guidelines on the PM Surya Ghar National Portal ↗.
Swayampurna Maharashtra Residential Solar (SMART) Scheme
Targeted financial assistance significantly reducing out-of-pocket costs.
Eligibility: BPL, SC/ST, and low-consumption domestic consumers (<100 units monthly average) under MSEDCL.
Under net metering, your imported and exported units are settled against each other, and any net surplus is credited or paid out at the export rate.
Surplus power you export to the grid earns approximately ₹3.35 per unit in Maharashtra.
Rest of Maharashtra (Pune, Nagpur, Nashik)
Mumbai City
Mumbai Suburbs
Mumbai Region
Maharashtra receives 4.9 to 5.2 kWh/m²/day peak solar insolation with over 300 clear sunny days across Marathwada, Vidarbha, and Western Maharashtra. Coastal Konkan and Mumbai receive approx 4.8 kWh/m²/day with higher humidity and marine soiling, requiring regular bi-monthly panel cleaning.
Follow this official procedural workflow to secure DISCOM grid connectivity and claim your direct benefit transfer (DBT) subsidy under the PM Surya Ghar Muft Bijli Yojana.
Register on the PM Surya Ghar national portal and submit an online net metering application to MSEDCL, Adani Electricity, Tata Power, or BEST with your consumer number.
Select a registered solar installer in Maharashtra. The EPC vendor installs ALMM-approved DCR modules and a grid-tied inverter meeting CEA safety standards.
The local DISCOM engineer inspects the solar plant, AC/DC distribution boxes, and earthing before installing a tested bi-directional net meter.
DISCOM uploads the commissioning certificate to the national portal. Central subsidy of up to ₹78,000 is credited directly into your bank account within 30 days.
At an average tariff of ₹8.80 per unit, the important sizing decision is how much daytime consumption you can offset—not simply the largest system your roof can hold. The cities tracked here average 4.8 peak-sun-hours a day in our generation model.
A residential system of 3 kW or more reaches the current central PM Surya Ghar cap of ₹78,000. That does not mean 3 kW is right for every household: match it to the bill, shadow-free roof area and sanctioned load.
For commercial sites, start with the load profile: office, factory and retail demand during solar hours drives the value of net metering more reliably than an annual bill alone.
DISCOM references in the current state record: Maharashtra State Electricity Distribution Co. Ltd, Brihanmumbai Electric Supply and Transport, Adani Electricity Mumbai Limited, Tata Power Company.
Model commercial solar cash flow →Empanelled solar companies providing turnkey net metering, subsidy paperwork, and Tier-1 hardware warranty.
Feature your company at the top of Maharashtra and its districts. Reach over 10,000 monthly homeowners seeking rooftop solar calculations and verified quotations.
Ranked strictly by verified government installation track record on PM Surya Ghar (state installations and commissioned capacity in kW).
Select your district to view registered solar installers in Maharashtra. Strictly 10 verified profiles per page with official PM Surya Ghar credentials.
No vendor records found matching your filter criteria.
Try searching for a different company name or clearing the brand filter.
City-specific sunshine data, local solar irradiance, and verified installer coverage across Maharashtra.
The average domestic electricity tariff in Maharashtra is approximately ₹8.8 per unit. Your actual rate varies by usage slab and DISCOM, with higher consumption slabs exceeding ₹15 per unit.
Residential consumers in Maharashtra can get up to ₹78,000 under the central PM Surya Ghar scheme for a 3 kW or larger system, calculated as ₹30,000/kW for the first 2 kW plus ₹18,000 for the third kW.
Currently, consumers in Maharashtra receive the full central PM Surya Ghar subsidy of up to ₹78,000 directly deposited to their bank account via DBT upon successful plant commissioning and net meter installation.
Register on the PM Surya Ghar national portal (pmsuryaghar.gov.in) and choose your local DISCOM in Maharashtra. Your empanelled solar EPC vendor will submit technical feasibility and coordinate bidirectional meter testing.
Aapka purana project record mil gaya hai. Nayi calculation ko kaise save karna chahte hain?
Instant estimate with subsidy breakdown and verified local quotes.
Help installers recommend the right solar mounting structure for your roof.
We match your solar capacity with your sanctioned load and local net-metering rules.
Found on your electricity bill (e.g. 3 kW or 5 kW)
Found on your monthly electricity bill. Helps verify your sanctioned load and DISCOM subsidy eligibility faster.
DISCOM Tariff & MNRE Subsidy Simulation
Opening your detailed solar feasibility report and installer quotes...
Loading your verified profile...
Save ₹20,000 to ₹40,000 by comparing bids from DISCOM-empanelled installers under PM Surya Ghar. No obligation, 100% free.