Net Metering Calculator India: Import, Export & Bills

State-wise Solar Bi-directional Metering, Export Banking, and DISCOM Bill Offsets

Not every state pays for your surplus the same way. Under net metering a unit exported cancels a unit imported; under net billing it earns only a low export rate. This calculator applies your state's actual policy and shows what the difference costs you.

2026 DISCOM Tariffs All 36 States & UTs Official SERC Regulations Free & Instant
PM Surya Ghar Subsidy Guide
Step 1 / 6
Step 1 / 6

Select Your State & District

Electricity tariffs and state subsidy grants depend directly on your DISCOM and local solar irradiance.

Please select your state before proceeding

Electricity Distribution Company (DISCOM)
₹ /u

Solar Capacity, Bill & Sanctioned Load

Tell us what you know. Our engineering engine derives panel wattage, sun hours, and sizing behind the scenes.

kW
₹/mo
₹ /unit

Average DISCOM rate: ₹/unit in .

kW

Terrace Structure & System Preferences

Select your mounting structure to retain full terrace usability for walking and household activities.

DISCOM Net Metering & Export Engine

State Electricity Regulatory Commission (SERC) Rules

%
1. State Net Metering Policy & DISCOM Buyback Rate Verified
2. On-Site Solar Self-Consumption vs Grid Export Modeled
3. Bi-Directional High-Slab Unit Offset Computed
4. Net Monthly Bill & Annual Export Revenue Finalized

Unlock Your Detailed Solar Report

Enter your 10-digit mobile number to view the itemized price breakdown, PM Surya Ghar subsidy deduction, and engineering report.

+91

6-digit SMS code sent to: +91

Auto-detecting SMS OTP...
Clipboard OTP:
Resend code in s

Calculation based on MNRE PM Surya Ghar subsidy guidelines. By continuing, you agree to receive customized solar quotes.

Net Metering Settlement Breakdown

Estimated Annual Net Metering Savings

~₹/month savings ()

Applicable State Policy
Value of self-consumed units
₹
Value of exported units
₹
Export rate
₹/u
Self-Consumed Units
u/yr
Exported Units
u/yr

Sanctioned Load Advisory

Bill Before Solar: ₹/mo
→
Bill After Net Metering: ₹/mo
How this is calculated Policy data updated: 18 Nov 2026
  • Self-consumed units are worth your full retail tariff because they directly replace electricity you would otherwise buy from the grid.
  • Exported units are worth your full retail tariff under true net metering (1:1 offset), but are credited only at the state APPC export rate under net billing or gross metering.
  • Both policy types and export tariffs are derived from our verified state database and align with the latest state electricity regulatory commission orders.
  • The advantage vs net billing metric highlights the extra financial gain of true net metering over feed-in billing models.

How Net Metering Works in India

A bidirectional net meter enables two-way power flow between your solar rooftop system and the local electricity distribution network.

1

Rooftop Solar Generation

During daylight hours, your rooftop solar panels generate DC power, converted to grid-compliant 230V/415V AC electricity by your on-grid inverter.

2

Instant Behind-the-Meter Consumption

The generated solar power first feeds your home appliances running during the day (fans, refrigerator, lights, AC, pumps). This energy is completely free and never passes through the grid.

3

Surplus Grid Export via Bi-directional Meter

Any surplus power not consumed instantly flows backward through your bi-directional smart net meter into the DISCOM grid, running your export register forward.

4

Monthly Bill Settlement (1:1 Unit Offset)

At each billing cycle, your DISCOM deducts exported units from imported units. You pay only for the net difference plus fixed demand charges.

5

Annual Banking Cycle & APPC Settlement

Surplus banked units carry forward across monthly bills. At the end of the settlement year (typically March 31), any remaining banked units are paid out by the DISCOM at the state APPC rate.

Net Metering vs Net Billing vs Gross Metering

Understanding how Indian state regulators (SERCs) classify rooftop solar settlement models and what it means for your financial returns.

Settlement Model How Billing Works Export Unit Valuation Self-Consumption Benefit Unit Banking Best For
Net Metering Exported units cancel imported units 1:1. Consumer pays only for the net difference. Full retail electricity tariff (highest value). Full benefit — direct avoidance of retail tariff slabs. Yes, banked until annual settlement cycle. Homeowners & residential societies (up to 10 kW).
Net Billing (Net Feed-in) Imports billed at full retail tariff. All exports credited separately at a low fixed rate. Lower APPC or generic feed-in tariff (typically ₹2.25 to ₹3.50/unit). High incentive — every unit consumed on-site saves full retail tariff. No unit banking — monetary credits offset against the current bill. Commercial, industrial, or residential systems above 10 kW in select states.
Gross Metering All generated solar power is exported to the grid. All home consumption is imported and billed normally. Fixed Feed-in Tariff (FiT) per total generation. None — household cannot use solar power directly. No banking — independent power producer model. Independent power plants, large commercial rooftops with zero daytime load.

Solar Capacity & Net Metering Benchmark Matrix (1 kW to 10 kW)

Representative generation and financial performance across standard residential rooftop systems under Indian solar conditions (4.7 average peak sun hours).

System Size Daily Units Monthly Units Self-Consumed (50%) Grid Export (50%) Monthly Offset Annual Savings (Net Metering) Net Metering Advantage
1 kW 3.7 units 110 units 669 units 669 units ₹₹686/mo ₹₹8,229/yr +₹₹2,362
2 kW 7.3 units 220 units 1338 units 1338 units ₹₹1,371/mo ₹₹16,457/yr +₹₹4,723
3 kW 11 units 330 units 2007 units 2007 units ₹₹2,057/mo ₹₹24,686/yr +₹₹7,085
4 kW 14.7 units 440 units 2676 units 2676 units ₹₹2,743/mo ₹₹32,915/yr +₹₹9,446
5 kW 18.3 units 550 units 3345 units 3345 units ₹₹3,429/mo ₹₹41,144/yr +₹₹11,808
8 kW 29.3 units 880 units 5353 units 5352 units ₹₹5,486/mo ₹₹65,836/yr +₹₹18,893
10 kW 36.7 units 1100 units 6691 units 6690 units ₹₹6,858/mo ₹₹82,293/yr +₹₹23,616

Calculations reflect typical residential tariff averages and state APPC export rates. Actual savings depend on your specific DISCOM slab and day vs night consumption mix.

Export Rate by State

State Policy Retail tariff Export rate
Maharashtra Net metering ₹₹8.80 ₹₹3.35
Gujarat Net metering ₹₹5.80 ₹₹2.25
Uttar Pradesh Net metering ₹₹7.20 ₹₹2.80
Karnataka Net metering ₹₹7.40 ₹₹3.56
Tamil Nadu Net billing ₹₹6.50 ₹₹3.10
Rajasthan Net metering ₹₹7.10 ₹₹3.14

Where the export rate is far below the retail tariff, self-consumption matters much more — shift heavy loads to daylight hours.

State-by-State Net Metering Policy Directory (All 36 States & UTs)

Official rooftop solar settlement policies, active power distribution companies (DISCOMs), average residential tariffs, and APPC export rates across Indian states and union territories.

State / UT Settlement Model Avg Retail Tariff Grid Export Rate Major DISCOMs Sanctioned Load Rule
Andaman and Nicobar Islands Net metering ₹₹5.50 ₹₹2.50 AND Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Andhra Pradesh Net metering ₹₹6.90 ₹₹2.09 APSPDCL, APCPDCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Arunachal Pradesh Net metering ₹₹5.80 ₹₹2.10 APDCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Assam Net metering ₹₹6.80 ₹₹2.70 ASEB Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Bihar Net metering ₹₹7.50 ₹₹2.60 NBPDCL, SBPDCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Chandigarh Net metering ₹₹4.80 ₹₹2.60 CEDCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Chhattisgarh Net metering ₹₹6.10 ₹₹2.40 CSPDCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Dadra and Nagar Haveli and Daman and Diu Net metering ₹₹4.20 ₹₹2.30 DNHDD Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Delhi Net metering ₹₹6.80 ₹₹3.00 BRPL, BYPL, TPDDL Unrestricted capacity for residential consumers. System can be sized beyond sanctioned load subject to technical feasibility.
Goa Net metering ₹₹5.10 ₹₹2.50 CSEZ Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Gujarat Net metering ₹₹5.80 ₹₹2.25 UGVCL, DGVCL, MGVCL Under GERC net metering regulations, residential consumers can install rooftop solar capacity up to 100% of their sanctioned load without mandatory load enhancement.
Haryana Net metering ₹₹6.20 ₹₹2.80 UHBVN, DHBVN Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Himachal Pradesh Net metering ₹₹5.50 ₹₹2.60 HPSCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Jammu and Kashmir Net metering ₹₹4.60 ₹₹2.50 JKSPDCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Jharkhand Net metering ₹₹6.30 ₹₹2.55 JBVNL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Karnataka Net metering ₹₹7.40 ₹₹3.56 BESCOM, HESCOM Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Kerala Net metering ₹₹7.60 ₹₹3.15 KSEB Rooftop solar capacity allowed up to 100% of sanctioned load, strictly subject to the 90% DT capacity ceiling.
Ladakh Net metering ₹₹3.90 ₹₹2.55 LADPCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Lakshadweep Net metering ₹₹5.20 ₹₹2.45 LKVCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Madhya Pradesh Net metering ₹₹6.70 ₹₹2.75 MPPMCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Maharashtra Net metering ₹₹8.80 ₹₹3.35 MSEDCL, BEST, AEML Rooftop solar capacity allowed up to 100% of sanctioned load, with commercial & industrial consumers permitted up to 5 MW.
Manipur Net metering ₹₹6.10 ₹₹2.25 MSPCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Meghalaya Net metering ₹₹5.90 ₹₹2.30 MePDCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Mizoram Net metering ₹₹6.00 ₹₹2.20 ZESCO Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Nagaland Net metering ₹₹6.30 ₹₹2.35 NESCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Odisha Net metering ₹₹6.00 ₹₹2.65 CESU, NESCO Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Puducherry Net metering ₹₹4.50 ₹₹2.40 PED Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Punjab Net metering ₹₹6.50 ₹₹2.90 PSPCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Rajasthan Net metering ₹₹7.10 ₹₹3.14 JVVNL, JDVVNL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Sikkim Net metering ₹₹5.60 ₹₹2.45 SEPDCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Tamil Nadu Net billing ₹₹6.50 ₹₹3.10 TANGEDCO Capacity up to 100% of sanctioned load (30% per-phase DT limit). Net metering capped at 10 kW; higher capacities operate under net billing.
Telangana Net metering ₹₹7.10 ₹₹2.50 TSNPDCL, TSSPDCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Tripura Net metering ₹₹6.20 ₹₹2.40 TSECL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Uttar Pradesh Net metering ₹₹7.20 ₹₹2.80 DVVNL, MVVNL, PVVNL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
Uttarakhand Net metering ₹₹5.70 ₹₹2.80 UPCL Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).
West Bengal Net metering ₹₹7.30 ₹₹2.85 WBSEDCL, CESC Rooftop solar capacity allowed up to 100% of sanctioned load (or 80% for certain transformer limits).

Sanctioned Load & Grid Interconnection Guidelines

Key regulatory requirements enforced by Indian DISCOMs before granting net metering interconnection approval.

Capacity Tied to Sanctioned Load

In most Indian states, rooftop solar capacity is permitted up to 100% of your sanctioned connected load. If your home has a 3 kW sanctioned load, you can install up to a 3 kW solar system. Installing a 5 kW system requires applying for a load enhancement on your electricity bill.

Single-Phase vs Three-Phase Interconnection

Systems up to 3 kW (or 5 kW in some states like Delhi and Gujarat) connect to a standard single-phase 230V line. Systems above 5 kW require a three-phase 415V supply. If your connection is single-phase and you want a larger system, you can request a phase conversion from your DISCOM.

Distribution Transformer (DT) Capacity Cap

CEA guidelines and state regulations limit the cumulative rooftop solar capacity on any local distribution transformer to 75% to 80% of its rated kVA capacity. Applying early secures your transformer capacity allocation.

Anti-Islanding Protection

All grid-tied inverters must feature certified anti-islanding protection (IEC 62116 / IS 16221). In the event of a grid power failure, the inverter automatically disconnects within 2 seconds to protect utility lineworkers.

Step-by-Step DISCOM Net Metering Application Process

Under PM Surya Ghar: Muft Bijli Yojana, applying for net metering is streamlined through a single national portal.

1

Portal Registration

Register on the National Portal for Rooftop Solar (pmsuryaghar.gov.in) with your state, DISCOM name, and electricity consumer account number.

2

Technical Feasibility Approval (TFA)

Your local DISCOM verifies your sanctioned load and transformer capacity, issuing technical feasibility approval within 10 to 15 days.

3

Installation by Registered Vendor

Choose an MNRE-empanelled vendor to install ALMM-compliant solar modules and a BIS-certified grid-tied inverter.

4

Inspection & Bi-directional Meter Installation

The DISCOM inspects the installation, tests the bidirectional net meter, and replaces your existing unidirectional meter.

5

Commissioning Certificate & Subsidy Credit

The DISCOM issues the official commissioning certificate online. Central government subsidy (up to ₹78,000) is credited directly to your bank account via DBT within 30 days.

Continue planning

Solar Bill Simulator

Month-by-month bills with credits applied.

Open Calculator →

Solar Export Earnings Calculator

25-year income from exported units.

Open Calculator →

On-Grid Solar System Calculator

Full system sizing and savings.

Open Calculator →
Regional Solar Hubs

Explore Rooftop Solar by State & City

Calibrated with state Discom tariffs, local net-metering policies, and PM Surya Ghar subsidies across India.

Frequently Asked Questions

What is the difference between net metering and net billing?

Under net metering an exported unit cancels an imported unit at the same retail tariff. Under net billing exports are bought at a lower fixed rate while imports are charged at retail, so the same surplus is worth considerably less.

Which is better for me as a homeowner?

Net metering, clearly — every exported unit is worth your full tariff. Where your state uses net billing, the priority shifts to self-consumption: running the washing machine, pump and air conditioner during daylight is worth real money.

What is gross metering?

Everything you generate is sold to the DISCOM at a fixed rate, and everything you consume is bought back at retail. It removes the benefit of self-consumption entirely and is generally the least attractive arrangement for a residential rooftop.

How do I apply for net metering in India?

Through your DISCOM, usually via the national PM Surya Ghar portal. You submit the application with a registered vendor, get feasibility approval, install, then receive inspection and a bidirectional meter. Most installers handle the paperwork as part of the quote.

Is there a limit on system size for net metering?

Yes, and it varies by state. Residential limits are typically tied to your sanctioned load, and many states cap rooftop net metering at 10 kW for domestic consumers. Above that, net billing or open-access rules usually apply.

Can my state change its policy after I install?

Policies do change, though existing installations are usually grandfathered for a defined period. This is a genuine reason not to size a system purely around export income — the self-consumption benefit is far more durable than the export rate.

Which settlement model is best for Indian residential consumers: Net Metering, Gross Metering, or Net Billing?

Net metering is overwhelmingly the best model for residential consumers, as it allows 1:1 unit offsets against expensive retail power slabs. Gross metering and net billing credit exports at lower wholesale rates.

What happens to excess banked solar units at the end of the financial year?

Most state DISCOMs settle accumulated banked units annually on March 31 or September 30, paying the homeowner at the prevailing APPC rate (typically ₹2.00–₹3.50/kWh).

Do net metering policies vary between Indian states?

Yes. While PM Surya Ghar guarantees residential net metering up to 10 kW across most states, specific banking charges, settlement cycles, and commercial HT limits differ by state regulatory commissions.

Do I still have to pay fixed charges on my electricity bill with net metering?

Yes. Fixed charges (sanctioned load demand charges) and electricity duty remain payable based on your connected load capacity, even if your net energy consumption is zero.

Who pays for the bi-directional net meter?

In most states, the consumer pays a nominal testing and meter procurement charge (typically ₹2,500 to ₹5,000) or rents it from the DISCOM. Under PM Surya Ghar, many states provide smart net meters at subsidized or zero upfront cost.

What happens during a power grid outage with a grid-tied net-metered system?

Standard grid-tied inverters immediately shut down during a power cut for safety (anti-islanding protection). If you require backup power during load shedding, you will need a hybrid solar inverter with battery storage.

Before you rely on this estimate

This calculator produces a planning range from your inputs and the assumptions shown on the page. It cannot replace a site visit, roof-shade survey, Discom approval or supplier quotation.

A calculator is not a quotation. A written quote should separately state the module and inverter model, mounting structure, protection equipment, taxes, net-metering work, warranty and completion timeline.

Next step: turn this result into a capacity, roof-space and budget decision.

Calculate system cost →