A factory's solar economics depend primarily on daytime power consumption and shift alignment. Unlike residential setups, high-tension industrial consumers recover project costs through direct daytime energy displacement, reduced peak demand charges, and Section 32 accelerated depreciation. This tool models factory plant sizing against your sanctioned load, shift pattern, and state electricity regulations.

Factory Power Specifications

kW
Sanctioned Demand
kW

On-grid rooftop solar capacity in India is typically capped at 100% of your sanctioned connected load.

Round-the-clock and double shifts consume 85% to 100% of solar generation directly, cutting payback time.

₹

Enter your average monthly DISCOM invoice including energy and demand charges.

Optional
sq ft

Industrial trapezoidal or standing-seam PEB roofs require ~100 sq. ft per kW.

Used to calculate Section 32 40% Accelerated Depreciation tax shield for Year 1.

₹ /unit

State benchmark HT rate: ₹/unit. You can edit this to match your actual DISCOM tariff schedule.

Industrial Solar & Captive Plant Sizer

HT Tariff Offset, Section 32 Tax Shield & LCOE Engine

%
1. Profiling factory sanctioned contract demand & shift cycle...
2. Sizing solar capacity, shed area & tiered EPC scale rate...
3. Applying 40% WDV accelerated depreciation & corporate tax shield...
4. Computing 25-year NPV, LCOE (₹/kWh) & Open Access status...
How this is calculated Rates updated: 18 Nov 2026
  • Load-profile match is the stored default of 75% for single-shift operation; double and triple shifts capture proportionally more of the day's generation since load extends into the hours solar produces.
  • System size targets covering daytime load without materially exceeding it — oversizing beyond what a single-shift factory can consume in real time earns only the lower export rate on the surplus.
  • No PM Surya Ghar subsidy applies; industrial connections are commercial-tariff consumers and recover cost through energy savings and depreciation, the same as any commercial installation.
  • Systems above 1 MW commonly fall under state open-access or captive-generation regulations rather than simple net metering — this changes the settlement mechanism and needs case-specific regulatory review.
  • Tiered EPC cost benchmark: ₹45/W for <100 kW, ₹38/W for 100 kW to 1 MW, and ₹32/W for >1 MW scale.
  • Accelerated Depreciation modeled at 40% Written Down Value (WDV) under Section 32 of the Income Tax Act, 1961.
  • Annual module degradation modeled at 2% in Year 1 (LID) and 0.55% annual compound degradation thereafter.
  • Annual O&M cost modeled at ₹500/kW/year with standard 3% annual escalation.

Understanding Industrial Solar Economics in India

Industrial facilities in India face some of the highest grid electricity tariffs in the world, typically paying between ₹7.50 and ₹11.00 per kilowatt-hour (kWh) on High Tension (HT) supply lines (11 kV, 22 kV, or 33 kV). These bills comprise two primary components: fixed monthly contract demand charges (billed per kVA of sanctioned demand) and variable energy charges (billed per unit of energy consumed).

Rooftop solar fundamentally transforms industrial energy costs by directly offsetting variable energy charges during daylight hours. Because industrial production peaks between 9:00 AM and 5:00 PM, factory machinery draws power directly from on-site solar inverters before pulling any energy from the DISCOM grid. This internal self-consumption avoids costly transmission losses, wheeling charges, and peak-slot Time of Day (ToD) tariff penalties.

Shift Patterns and Load-Profile Matching

A factory's solar return on investment depends heavily on operating shifts. Unlike residential systems that export excess electricity back to the grid at low DISCOM feed-in rates (often only ₹2.00 to ₹3.00 per unit), industrial installations deliver maximum value when 100% of generated solar power is consumed on-site at the full retail tariff rate.

Single Shift (Daytime Only)

Operating 8 to 10 hours daily (typically 9:00 AM to 6:00 PM). Self-consumption reaches approximately 70% to 75% of solar generation. Weekend shutdowns mean Sunday generation must be exported or curtailed. Typical payback: 3.5 to 4.2 years.

Double Shift (Morning + Evening)

Operating 16 hours daily across two shifts. Solar power covers morning and midday production fully, while steady baseline load captures approximately 85% to 90% of all generated solar power with minimal export. Typical payback: 3.0 to 3.5 years.

Round the Clock (24x7 Three Shifts)

Continuous manufacturing plants (foundries, chemical units, textiles, cold storage). Consumes 98% to 100% of solar generation instantly with zero export losses. Solar units displace full daytime grid power. Typical payback: 2.4 to 3.0 years.

Payback by Shift Pattern

Shift pattern Load match Payback
Single shift 75% 4.9 yrs
Double shift 98% 3.7 yrs
Round the clock 100% 3.6 yrs

For a factory with a ₹5 lakh monthly bill. Round-the-clock operations pay back fastest because they consume solar generation directly rather than exporting it.

Tax Savings: 40% Accelerated Depreciation Under Section 32

Under Section 32 of the Income Tax Act, 1961, solar photovoltaic equipment in India is categorized as renewable energy infrastructure eligible for 40% Accelerated Depreciation (AD) on the Written Down Value (WDV) method. For profitable manufacturing companies, this represents a substantial first-year cash tax shield.

Example: Financial Impact on a 100 kW Rooftop Plant

Total Project Cost ₹38,00,000
Year 1 Depreciation (40%) ₹15,20,000
Tax Cash Saved (@ 25%) ₹3,80,000
Effective Year 1 Outlay ₹34,20,000

Note: If commissioned on or after October 1st in the financial year, the 180-day half-year rule applies (20% in Year 1, with the remainder rolled forward to Year 2). Commercial businesses can also claim Goods and Services Tax (GST) Input Tax Credit (ITC) on eligible solar equipment components.

Net Metering, Zero Export, and Green Energy Open Access Rules

Depending on your facility's connected load and state regulatory guidelines, solar implementation in India falls into three primary operational models:

1. Standard On-Grid Net Metering

Permitted for systems typically up to 500 kW or 1 MW depending on state policies. Bi-directional meters record generation and grid draw, settling net balance monthly. Ideal for plants with moderate capacity where DISCOM approval is fast.

2. Behind-the-Meter Captive (Zero Export)

For factories with loads between 200 kW and 5 MW that want instant deployment without DISCOM export clearance delays. A Zero Export Device (ZED) or Reverse Power Relay (RPR) modulates inverters in milliseconds to ensure solar never flows backwards into the grid.

3. Green Energy Open Access (Rules 2022)

The Ministry of Power lowered the open access threshold from 1 MW (1,000 kW) to 100 kW for renewable energy consumers. If your factory has limited roof space, you can procure green energy from an off-site solar park under open access wheeling agreements.

Factory Rooftop Engineering: PEB Sheds and DG Synchronization

Industrial installations require specialized engineering practices distinct from standard RCC rooftop arrays:

  • Metal PEB Sheet Mounting: Pre-Engineered Building sheds use trapezoidal profile or standing-seam sheet clamping. Aluminium short rails with non-penetrating clamps prevent roof punctures and long-term water seepage during Indian monsoons.
  • Structural Load Assessment: Typical industrial solar arrays exert a dead load of 10 to 14 kg/m². Prior structural stability certification by a chartered engineer ensures purlins and trusses withstand wind gusts per IS 875 (Part 3) standards.
  • DG-PV Synchronization: In industrial estates prone to grid outages, factories run backup diesel generator sets. A specialized DG-PV synchronizing controller communicates with solar inverters via RS485/Modbus, throttling solar output to maintain a minimum 25% to 30% base load on the diesel engine. This eliminates reverse power damage to alternator windings while cutting diesel consumption by up to 60%.

State-Wise Industrial Solar Tariffs and Policy Benchmarks

Average High Tension (HT) commercial & industrial tariffs, DISCOM buyback rates, and solar yield data retrieved from our database for major manufacturing hubs in India:

State Avg HT Tariff Export Buyback Solar PSH Yield Major DISCOMs Policy Framework
Gujarat ₹8.1/unit ₹2.25/unit 5.2 hrs/day UGVCL, DGVCL, MGVCL, PGVCL, TORRENT net metering
Haryana ₹8.7/unit ₹2.80/unit 5.0 hrs/day UHBVN, DHBVN net metering
Karnataka ₹10.4/unit ₹3.56/unit 4.9 hrs/day BESCOM, HESCOM net metering
Maharashtra ₹12.3/unit ₹3.35/unit 4.8 hrs/day MSEDCL, BEST, AEML, TPC net metering
Punjab ₹9.1/unit ₹2.90/unit 4.9 hrs/day PSPCL net metering
Rajasthan ₹9.9/unit ₹3.14/unit 5.4 hrs/day JVVNL, JDVVNL net metering
Tamil Nadu ₹9.1/unit ₹3.10/unit 4.9 hrs/day TANGEDCO net billing
Telangana ₹9.9/unit ₹2.50/unit 5.1 hrs/day TSNPDCL, TSSPDCL net metering
Uttar Pradesh ₹10.1/unit ₹2.80/unit 4.9 hrs/day DVVNL, MVVNL, PVVNL, PuVVNL, KESCO net metering
West Bengal ₹10.2/unit ₹2.85/unit 4.6 hrs/day WBSEDCL, CESC net metering

Tariffs reflect benchmark state HT manufacturing rates. Actual billing includes demand charges, ToD slots, and state electricity duties.

Continue planning

Commercial Solar ROI Calculator

The simpler single-shift commercial case.

Explore Calculator →

Solar Project Feasibility Calculator

Full NPV/IRR/DSCR for the factory investment.

Explore Calculator →

Big Project Solar Calculator

For factories sizing into the MW range.

Explore Calculator →
Regional Solar Hubs

Explore Rooftop Solar by State & City

Calibrated with state Discom tariffs, local net-metering policies, and PM Surya Ghar subsidies across India.

Frequently asked questions

Why does shift pattern matter for solar sizing at a factory?

Solar only generates during daylight. A single-shift factory running only in daytime hours consumes generation almost as it is produced; a factory running through the night still draws grid power overnight regardless of how much solar it installed.

What is captive generation and when does it apply?

Captive generation lets a company generate its own power (directly or through a group entity) primarily for self-consumption, with specific ownership and consumption rules under Indian electricity regulations. It typically becomes relevant above 1 MW and needs state-specific regulatory confirmation.

What is open access and why does it matter above 1 MW?

Open access allows a large consumer to source power from outside their local DISCOM, including from their own or a third-party solar plant. Above 1 MW, factories often evaluate open access alongside or instead of straightforward rooftop net metering.

Should a factory oversize solar to cover future expansion?

Only cautiously. Surplus generation beyond current consumption typically settles at a lower export rate, so sizing well ahead of actual load growth usually returns less per rupee than sizing close to current demand and expanding later.

Does industrial solar get any subsidy in India?

No direct capital subsidy — PM Surya Ghar is residential-only. Some states offer industrial policy incentives such as capital subsidies or SGST reimbursement for solar as part of broader industrial promotion schemes; check your state industries department separately.

How does a three-shift factory's payback compare to a single-shift one?

Meaningfully faster, because a round-the-clock factory consumes essentially all its solar generation directly at the full retail tariff rather than exporting a share at the lower export rate — often cutting payback by a year or more versus single-shift operation.

Can industrial High Tension (HT) consumers use on-grid net metering?

Net metering on HT connections (11 kV/33 kV) varies by state. Where net metering is capped (often at 500 kW or 1 MW), industries install captive solar systems sized strictly to match base daytime factory loads.

What is open access and when should an industry choose it over rooftop solar?

Open access allows consumers with connected loads over 1 MW (or 100 kW under green open access rules) to buy power directly from off-site utility-scale solar parks when on-site factory roof area is insufficient.

Can an industrial rooftop solar system synchronize with on-site diesel generators?

Yes. A specialized DG-PV synchronizing controller modulates inverter output in real-time, preventing reverse power flow into the generator while saving up to 60% on expensive diesel fuel.

Before you rely on this estimate

This calculator produces a planning range from your inputs and the assumptions shown on the page. It cannot replace a site visit, roof-shade survey, Discom approval or supplier quotation.

A calculator is not a quotation. A written quote should separately state the module and inverter model, mounting structure, protection equipment, taxes, net-metering work, warranty and completion timeline.

Next step: validate the hourly load profile, demand charges and export assumptions—not only the annual bill.