On-Grid Solar System Calculator India: Cost & Savings
Size your grid-connected rooftop solar plant accurately based on your monthly electricity bill, local DISCOM net metering regulations, and PM Surya Ghar subsidy benefits. Estimate daytime self-consumption savings, exported surplus credits, and 25-year financial returns without signing up.
Select Your State & District
Electricity tariffs and state subsidy grants depend directly on your DISCOM and local solar irradiance.
Please select your state before proceeding
Monthly Electricity Bill & Consumption
Tell us what you know. Our engineering engine derives panel wattage, sun hours, and sizing behind the scenes.
As per our data, the average DISCOM rate is ₹/unit in .
Terrace Structure & System Preferences
Select your mounting structure to retain full terrace usability for walking and household activities.
Daytime self-consumed solar energy offsets costly retail tariff slabs directly (100% value), while exported surplus is settled under your DISCOM's net metering or net billing policy.
On-Grid Net Metering & Sizing Engine
DISCOM Interconnection & MNRE Subsidy Simulator
Unlock Your Detailed Solar Report
Enter your 10-digit mobile number to view the itemized price breakdown, PM Surya Ghar subsidy deduction, and engineering report.
6-digit SMS code sent to: +91
Calculation based on MNRE PM Surya Ghar subsidy guidelines. By continuing, you agree to receive customized solar quotes.
Down from ₹ to basic DISCOM grid charges of ₹.
Total Turnkey - Subsidy .
Your recommended solar capacity ( kW) is higher than your current sanctioned load ( kW). Most DISCOMs require solar capacity to match or be lower than the sanctioned load. You can easily apply for a load enhancement online on your DISCOM portal.
Itemized Turnkey Cost Breakdown
MNRE BenchmarksSystem Size Comparison (2 kW vs 3 kW vs 5 kW)
← Swipe →| Capacity | Monthly Gen | Subsidy | Net Cost | Savings/Mo |
|---|---|---|---|---|
| Optimal | ~ units |
Get 3 Free Quotes from PM Surya Ghar Empanelled Installers
DISCOM-approved contractors in provide free physical site inspection, shadow feasibility report, and complete net-metering liaison.
Recommended On-Grid Solar System
Estimated Monthly Savings
- System Capacity
- kW
- Solar Panels (550W DCR)
- 550W panels
- Required Shadow-Free Rooftop Area
- sq. ft (~ m²)
- Estimated Benchmark Cost
- Pre-subsidy
- PM Surya Ghar Central Subsidy
- Incl. state top-up
- Net Cost to Consumer
- Your net cost
- Daily Generation
- kWh
- Monthly Generation
- units
- Daytime Self-Consumed Units
- units
- % daytime
- Surplus Exported Units
- units
- banked to grid
For a kW on-grid system in , your electricity bill must have a sanctioned load of at least kW.
Calculation Assumptions & Methodology Benchmark data verified: 18 Nov 2026
- On-grid solar systems feed solar power directly to your active home circuits during sunlight hours, exporting surplus generation into the DISCOM grid through a bi-directional net meter.
- System sizing is calculated from your average monthly electricity consumption using regional solar irradiance values (4.5 to 5.2 peak sun hours/day) and standard system performance ratios (78%).
- Central financial assistance follows official PM Surya Ghar Muft Bijli Yojana guidelines: ₹30,000 per kW for the first 2 kW, ₹18,000 for the 3rd kW, with a maximum cap of ₹78,000 for residential homes.
- Financial returns incorporate 25-year lifetime projections with a 0.7% annual solar module degradation rate and a conservative 3% annual grid electricity tariff escalation.
Unlock Your Detailed Solar Report & Subsidy Breakdown Customize Your Rooftop Solar Preferences Enter 6-Digit SMS Verification Code
Enter your contact details to view itemized price breakdowns, PM Surya Ghar subsidy deductions, and engineering feasibility. Just a few quick technical details to generate your customized engineering feasibility report. 6-digit SMS verification code sent to: +91
Calculation based on MNRE PM Surya Ghar subsidy guidelines. By continuing, you agree to receive customized solar quotes.
25-Year Financial Comparison: With Solar vs Without Solar
Electricity tariffs across Indian DISCOMs historically rise between 3% to 5% annually. Here is how your cumulative expenditure looks over the 25-year operational lifespan of a tier-1 solar plant.
Paying recurring monthly utility bills at escalating slab rates over 25 years with zero asset ownership or return on spend.
Assuming a typical ₹3,000–₹5,000/month power bill with conservative 4% annual tariff compounding.
Upfront investment in an MNRE-approved rooftop solar installation offset by central subsidy and lifetime bill reduction.
Offsets up to 90% of electricity bills, with initial net capital recovered in approximately 3 to 4.5 years.
On-Grid System Size Guide
National benchmark estimates based on 70% daytime self-consumption. Select your specific state in the calculator for precise local tariff calculations.
| Monthly Bill | Recommended System | Net Cost (After Subsidy) | Monthly Bill Savings |
|---|---|---|---|
| ₹1,500 | 2 kW | ₹54,000 | ₹1,268 |
| ₹3,000 | 4 kW | ₹1,42,000 | ₹2,536 |
| ₹5,000 | 6.5 kW | ₹2,60,000 | ₹4,122 |
| ₹8,000 | 10 kW | ₹4,22,000 | ₹6,341 |
State-Wise Rooftop Solar Benchmarks (3 kW System)
Comparative evaluation of a standard 3 kW residential rooftop solar plant across major Indian states, incorporating local DISCOM retail tariffs, net metering regulations, and state top-up subsidies.
| State & Incentives | Average Tariff | Billing Policy | Export Credit Rate | Prominent DISCOMs | Total Subsidy | Net Consumer Cost | Monthly Savings | Payback Period |
|---|---|---|---|---|---|---|---|---|
| Maharashtra | ₹8.8/unit | Net Metering | ₹3.35/unit | MSEDCL, BEST, AEML | ₹78,000 | ₹87,000 | ₹3,019 | 2.4 years |
| Gujarat Top-Up | ₹5.8/unit | Net Metering | ₹2.25/unit | UGVCL, DGVCL, MGVCL | ₹98,000 | ₹67,000 | ₹2,155 | 2.6 years |
| Uttar Pradesh Top-Up | ₹7.2/unit | Net Metering | ₹2.80/unit | DVVNL, MVVNL, PVVNL | ₹1,08,000 | ₹57,000 | ₹2,491 | 1.9 years |
| Tamil Nadu Top-Up | ₹6.5/unit | Net Billing | ₹3.10/unit | TANGEDCO | ₹1,00,000 | ₹65,000 | ₹1,896 | 2.9 years |
| Karnataka | ₹7.4/unit | Net Metering | ₹3.56/unit | BESCOM, HESCOM | ₹78,000 | ₹87,000 | ₹2,586 | 2.8 years |
| Rajasthan Top-Up | ₹7.1/unit | Net Metering | ₹3.14/unit | JVVNL, JDVVNL | ₹95,000 | ₹70,000 | ₹2,734 | 2.1 years |
| Delhi Top-Up | ₹6.8/unit | Net Metering | ₹3.00/unit | BRPL, BYPL, TPDDL | ₹1,08,000 | ₹57,000 | ₹2,299 | 2.1 years |
| Kerala | ₹7.6/unit | Net Metering | ₹3.15/unit | KSEB | ₹78,000 | ₹87,000 | ₹2,651 | 2.7 years |
| West Bengal Top-Up | ₹7.3/unit | Net Metering | ₹2.85/unit | WBSEDCL, CESC | ₹93,000 | ₹72,000 | ₹2,390 | 2.5 years |
| Telangana | ₹7.1/unit | Net Metering | ₹2.50/unit | TSNPDCL, TSSPDCL | ₹78,000 | ₹87,000 | ₹2,577 | 2.8 years |
| Andhra Pradesh | ₹6.9/unit | Net Metering | ₹2.09/unit | APSPDCL, APCPDCL | ₹78,000 | ₹87,000 | ₹2,505 | 2.9 years |
| Madhya Pradesh | ₹6.7/unit | Net Metering | ₹2.75/unit | MPPMCL | ₹78,000 | ₹87,000 | ₹2,623 | 2.8 years |
| Haryana | ₹6.2/unit | Net Metering | ₹2.80/unit | UHBVN, DHBVN | ₹78,000 | ₹87,000 | ₹2,206 | 3.3 years |
| Punjab | ₹6.5/unit | Net Metering | ₹2.90/unit | PSPCL | ₹78,000 | ₹87,000 | ₹2,267 | 3.2 years |
| Assam Top-Up | ₹6.8/unit | Net Metering | ₹2.70/unit | ASEB | ₹1,23,000 | ₹42,000 | ₹2,347 | 1.5 years |
| Odisha Top-Up | ₹6.0/unit | Net Metering | ₹2.65/unit | CESU, NESCO | ₹1,38,000 | ₹27,000 | ₹2,093 | 1.1 years |
Calculated for an average 3 kW residential rooftop system generating approximately 360 units per month under PM Surya Ghar national guidelines. State top-up subsidies are subject to respective state renewable energy agency budget allocations and valid consumer category rules.
How an On-Grid Rooftop Solar System Operates
An on-grid (grid-tied) solar setup is the most economical and popular solar solution for Indian homes connected to a stable utility power grid. It requires no costly chemical batteries, utilizing the public electricity grid as a virtual infinite battery.
High-efficiency monocrystalline PERC or TOPCon solar panels installed on your rooftop absorb sunlight and convert photons into direct current (DC) electricity during daytime hours.
A string inverter transforms raw DC power into synchronized alternating current (AC) matching the voltage (230V single-phase or 415V three-phase) and 50 Hz frequency of your utility grid.
Solar electricity flows directly into your home distribution board. Active appliances such as refrigerators, air conditioners, fans, and computers run on free solar power first.
Any extra electricity not immediately consumed in your home is sent backward across a bi-directional net meter into the local distribution grid, accumulating energy credits.
When the sun sets, your home draws standard electricity from the grid seamlessly. At the end of the billing cycle, your DISCOM deducts exported credits from imported units.
Understanding Net Metering vs Net Billing Regulations in India
Electricity regulatory commissions (SERCs) in different Indian states prescribe specific billing mechanisms for grid-tied rooftop solar installations. Understanding your state's framework ensures realistic savings expectations.
Net Metering (1:1 Unit Offset)
The gold standard for residential solar consumers. Every kilowatt-hour (unit) of surplus solar energy exported directly offsets one unit of grid electricity imported. You only pay for net imported units. If your solar generation matches or exceeds your consumption, your energy consumption charges reduce to zero, leaving only fixed monthly meter charges.
Net Billing (Feed-in Tariff Settlement)
Under net billing regulations, electricity drawn from the grid is billed at normal progressive slab rates, while surplus solar units fed into the grid are purchased by the DISCOM at a predetermined Average Power Purchase Cost (APPC), typically between ₹2.50 to ₹3.80 per unit. In net billing states, maximizing daytime direct self-consumption provides the highest return.
Gross Metering (Commercial Feed-in)
Commonly mandated for commercial and industrial establishments above 10 kW or 500 kW capacity. In gross metering setups, all solar energy generated is fed directly into the DISCOM grid at an agreed long-term PPA feed-in tariff, while all building electricity is purchased at standard commercial tariff rates through a separate consumer connection.
Sanctioned Load Rules & DISCOM Approval Process
Before installing a grid-connected solar power plant, homeowners must adhere to local utility regulations regarding sanctioned load capacity and transformer limits.
Sanctioned Load Sizing Limit
Most state DISCOMs (such as MSEDCL in Maharashtra, UPPCL in Uttar Pradesh, and BESCOM in Karnataka) permit rooftop solar capacity up to 100% of your sanctioned load. For instance, if your sanctioned load is 3 kW, your maximum allowed solar inverter capacity is 3 kW.
Distribution Transformer Capacity
DISCOM technical regulations cap cumulative rooftop solar connections on a local distribution transformer (DT) at 70% to 100% of the transformer rated capacity. Applications are processed on a first-come, first-served basis through the national portal.
Sanctioned Load Enhancement
If your electricity consumption justifies a 5 kW solar plant but your sanctioned load is only 2 kW or 3 kW, you can submit an online load enhancement request on your DISCOM portal prior to or alongside your solar net metering application.
Anti-Islanding Safety Mechanism
All grid-tied inverters feature certified anti-islanding protection (IEC 62116). If the utility grid experiences a scheduled power cut or line fault, the solar inverter automatically disconnects within milliseconds to protect utility lineworkers from electrocution.
Rooftop Space, Electrical Hardware & Maintenance Guide
A durable rooftop solar installation requires suitable terrace space, high-quality mounting structures, and minimal periodic cleaning to sustain peak output for 25 years.
Shadow-Free Area Requirements
Modern 540W–550W mono-PERC solar modules require approximately 60 to 80 square feet (5.5 to 7.5 square meters) of shadow-free rooftop space per kilowatt of installed capacity. A 3 kW setup requires 180 to 240 square feet facing south.
South-Facing Optimal Tilt
In India, solar panels should face true south at an angle roughly matching your city latitude (typically 12° in southern states to 28° in northern states) to maximize solar radiation absorption across both summer and winter seasons.
Mounting Structures & Wind Rating
Galvanized iron (GI) or anodized aluminium elevated structures designed to withstand wind speeds up to 150 km/h ensure panels remain secure during monsoon storms without compromising roof waterproofing.
Simple Cleaning & Low Maintenance
Because on-grid systems have zero moving parts and no chemical battery electrolytes to replace, routine maintenance is limited to washing dust off the glass panels with plain water once every 10 to 14 days.
Methodology, Data Sources & Official Standards
FreeSolarCalculator.in provides vendor-neutral, data-driven estimates based on real-world Indian electricity tariffs, state solar policies, and official central government schemes.
Official Ministry Guidelines
Central financial assistance calculation rules are modeled strictly on the official Ministry of New and Renewable Energy (MNRE) PM Surya Ghar Muft Bijli Yojana gazette notifications.
State SERC Tariff Orders
Domestic electricity rates and net metering settlement terms are derived from published tariff orders issued by respective State Electricity Regulatory Commissions.
Solar Irradiance Datasets
Generation figures rely on solar radiation data (NASA SSE and National Institute of Solar Energy benchmarks) calibrated to Indian geographic coordinates.
Approved Equipment Standards
Calculations assume domestic content requirement (DCR) compliant solar cells and modules certified under MNRE Approved List of Models and Manufacturers (ALMM).
Editorial Review & Accuracy Commitment
Our calculation models, tariff schedules, and policy interpretations are regularly reviewed against official government circulars and utility updates. We maintain no affiliation with specific equipment manufacturers or proprietary brands, ensuring impartial and factual estimates for Indian homeowners.
Continue Planning Your Solar Journey
Solar Panel Cost Calculator
Complete price breakdown, equipment cost, and state-wise subsidy deduction.
Solar Export Earnings Calculator
Calculate monthly and 25-year revenue earned exclusively from exported solar units.
Solar vs Grid Cost Calculator
25-year side-by-side cumulative financial comparison of utility bills versus solar.
Authoritative Solar Guides & Industry Analysis
On-Grid vs Off-Grid vs Hybrid Solar System in India (2026 Comparison)
Detailed comparison of On-Grid, Off-Grid, and Hybrid solar rooftop setups across capital costs, battery maintenance, power outage resilience, and subsidy eligibility.
PM Surya Ghar Solar Loan Rejections: Causes, District Magistrate Directives, and Step-by-Step Approval Solutions
Exhaustive legal and procedural guide on resolving PM Surya Ghar rooftop solar loan rejections: analyzing bank branch NPA fears, administrative review interventions by District Magistrates, RBI collateral-free lending caps, and step-by-step escalation protocols for rapid approval.
Explore Rooftop Solar by State & City
Calibrated with state Discom tariffs, local net-metering policies, and PM Surya Ghar subsidies across India.
Browse Solar Guides by State
Top Solar MarketsFrequently Asked Questions About On-Grid Solar Systems
What is an on-grid solar system?
An on-grid (grid-tied) solar setup is connected directly to your utility company's power grid without chemical battery storage. During the day, solar electricity directly powers your running household appliances. Any surplus generation is sent into the grid via a bi-directional net meter. At night or during heavy overcast weather, your home draws power seamlessly from the utility grid.
How does net metering work with on-grid solar in India?
A bi-directional net meter tracks both the electricity you import from the grid and the excess solar electricity you export to it. At the end of every monthly billing cycle, the DISCOM subtracts your exported units from your imported units. If you generated 400 units and consumed 450 units, you are only billed for 50 net units. If you exported more than you imported, the surplus units roll over as bill credits for subsequent billing cycles within the settlement period.
What is the difference between net metering and net billing in India?
Under true net metering, exported solar units offset imported grid units on a 1:1 basis at your highest retail tariff rate. Under net billing (often applied to commercial consumers or residential systems above 10 kW in specific states), imported electricity is charged at standard retail slab rates, while exported surplus power is bought by the DISCOM at a lower wholesale rate known as the Average Power Purchase Cost (APPC), typically ₹2.50 to ₹3.80 per unit.
Do on-grid solar systems work during a power outage?
No. For worker safety, grid-tied inverters feature an automatic anti-islanding mechanism that turns off the solar inverter within milliseconds if the utility grid goes down. This prevents solar electricity from backfeeding into the distribution lines, protecting utility maintenance personnel from electrical shocks. If your area experiences frequent power cuts, you can install a hybrid solar system with battery backup or integrate solar with an existing home inverter.
How much subsidy do I get under PM Surya Ghar Muft Bijli Yojana?
Under the central PM Surya Ghar scheme, residential rooftop solar systems receive ₹30,000 per kW for the first 2 kW of capacity and ₹18,000 for the 3rd kW. The central subsidy is capped at a maximum of ₹78,000 for 3 kW and higher residential installations. In addition, several states such as Uttar Pradesh, Delhi, and Rajasthan offer supplementary state top-up subsidies that can be claimed alongside the central benefit.
How is the recommended solar system size determined?
Your ideal system size is calculated by dividing your average monthly electricity consumption (in units/kWh) by 120. In India, 1 kW of rooftop solar produces approximately 4 units of electricity per day, or roughly 120 units per month. For example, if your average electricity bill corresponds to 360 units per month, a 3 kW solar system will generate enough energy to balance your annual consumption.
What is sanctioned load and why does it matter?
Sanctioned load is the maximum electrical capacity approved for your meter connection by your local DISCOM. Most state electricity regulations restrict your rooftop solar plant capacity to 100% of your sanctioned load. If you require a 4 kW or 5 kW solar plant to offset your bills but your electricity connection has a sanctioned load of 2 kW, you must apply for a load extension on your DISCOM portal prior to solar commissioning.
How much rooftop area is required for an on-grid solar installation?
Modern high-efficiency 540W to 550W mono-crystalline PERC solar panels require roughly 60 to 80 square feet (5.5 to 7.5 square meters) of shadow-free rooftop space per kilowatt. Therefore, a standard 3 kW system requires between 180 and 240 square feet, while a 5 kW system needs about 300 to 400 square feet of unobstructed terrace area facing south.
What happens to surplus solar energy at the end of the year?
Under state net metering regulations, surplus solar units that remain unadjusted at the end of each billing cycle roll forward to the next month. At the end of the annual settlement cycle (usually March 31 or September 30 depending on the DISCOM), any accumulated net surplus units are compensated into the consumer's bank account or adjusted as bill credits at the state SERC approved feed-in or APPC rate.
What is the expected payback period for a residential on-grid solar plant?
With the PM Surya Ghar central subsidy and state incentives, most Indian residential rooftop installations recover their entire net capital investment within 3.5 to 5 years. After this payback window, the solar system delivers virtually free electricity for the remainder of its 25-year designed operational lifespan.
How does an on-grid solar system eliminate high electricity tariff slabs?
Indian electricity distribution utilities follow progressive telescopic billing where rates per unit increase substantially as consumption rises. Because solar generation powers daytime loads directly, your monthly units billed by the utility drop into the lowest, cheapest tariff tier, dramatically lowering your average cost per unit even for non-solar hours.
Can I add a battery to an on-grid system in the future?
Yes. You can upgrade an on-grid installation into a hybrid system in the future by replacing the standard grid-tied inverter with a hybrid bidirectional inverter and connecting a compatible lithium-ion or tubular lead-acid battery bank. If you plan to add storage later, installing a hybrid-ready inverter during initial setup saves replacement costs.
What maintenance is required for an on-grid solar rooftop system?
Because on-grid solar systems contain no moving parts or chemical battery fluids, routine maintenance is very simple. It only requires washing dust, dirt, and bird droppings off the glass surface of the solar modules with normal water once every 10 to 14 days. Periodic electrical checks of cables and isolator switches during annual servicing ensure maximum generation efficiency.