MNRE PM Surya Ghar 2026 Policy Verified

Solar Panel Installation Cost Calculator India

Enter your monthly electricity bill and get an instant estimate — recommended system size, total cost, PM Surya Ghar subsidy, and your net payable amount at 2026 Indian prices. Free, no sign-up.

100% Free & Independent No Sign-Up or Login Certified Engineer Math
50,000+ Indian homeowners calculated rooftop solar here
PM Surya Ghar Subsidy Guide
Step 1 / 6
Step 1 / 6

Select Your State & District

Electricity tariffs and state subsidy grants depend directly on your DISCOM and local solar irradiance.

Please select your state before proceeding

Electricity Distribution Company (DISCOM)
₹ /u

Monthly Electricity Bill & Sanctioned Load

Tell us what you know. Our engineering engine derives panel wattage, sun hours, and sizing behind the scenes.

₹3,000
₹

Estimated consumption: ~ units / mo C&I Commercial Tier

kW
kW

Intelligently derived from consumption (~ kW). Edit if different on your DISCOM bill.

Terrace Structure & System Preferences

Select your mounting structure to retain full terrace usability for walking and household activities.

Please select an option
Please select an option
Please select an option
Please select your terrace and system preferences above before proceeding.

Solar Cost & PM Surya Ghar Subsidy Engine

MNRE Benchmark Slabs & State Top-Up Rules

%
1. State DISCOM Tariff Slabs & Units Verified
2. Optimal System Size (kW) & Gross CAPEX Sized
3. Central DBT Subsidy (up to ₹78,000) Applied
4. Net Investment, Monthly Savings & Payback Ready

Unlock Your Detailed Solar Report

Enter your 10-digit mobile number to view the itemized price breakdown, PM Surya Ghar subsidy deduction, and engineering report.

+91

6-digit SMS code sent to: +91

Auto-detecting SMS OTP...
Clipboard OTP:
Resend code in s

Calculation based on MNRE PM Surya Ghar subsidy guidelines. By continuing, you agree to receive customized solar quotes.

Assumptions used Rates updated: 18 Nov 2026
  • System sized from your bill at your state's average domestic tariff.
  • Generation at your state's average peak sun hours with a 0.78 performance ratio.
  • Prices per watt from current market slabs (standard vs premium tier).
  • Central subsidy: ₹30,000/kW for the first 2 kW + ₹18,000 for the 3rd kW, capped at ₹78,000 (residential).
  • State top-up subsidies, where applicable, are not yet included — your net cost may be even lower.

System Size Guide — What Do You Need?

Monthly usage Recommended size Gross cost Subsidy Net cost
150 units 1.5 kW ₹90,000 ₹45,000 ₹45,000
250 units 2.5 kW ₹1,42,500 ₹69,000 ₹73,500
400 units 4 kW ₹2,20,000 ₹78,000 ₹1,42,000
600 units 5.5 kW ₹2,86,000 ₹78,000 ₹2,08,000
850 units 8 kW ₹4,00,000 ₹78,000 ₹3,22,000
1100 units 10 kW ₹5,00,000 ₹78,000 ₹4,22,000

Indicative national averages for on-grid systems with standard-tier panels. Use the calculator above for your state's exact numbers.

Comprehensive Guide to Solar Panel Installation Costs in India (2026)

Installing a rooftop solar panel system in India has evolved from an environmental initiative into one of the most reliable financial investments a homeowner can make. With domestic electricity tariffs rising at 4–7% annually across state Discoms, a properly sized grid-connected solar system delivers an internal rate of return (Irr) exceeding 25–30%, achieving complete capital payback within 3.0 to 4.2 years.

1. Turnkey System Cost Breakdown: Where Does Your Investment Go?

A complete on-grid solar quotation from verified installers includes design, supply, installation, and commissioning (Dsic). Capital expenditure (Capex) breaks down into five primary components:

45% Solar Pv Modules Mono Perc / Topcon 25-Year Warranty 20% Solar Inverter Dual Mppt String >97% Efficiency 12% Mounting Structures Galvanized Iron / Alum 150 km/h Wind Rated 13% Balance of System (BOS) Acdb, Dcdb & Cables Spd Surge Protection 10% Net Metering & Labor Discom Sanction Net Meter Inspection
Figure 1: Capital expenditure (Capex) breakdown for on-grid residential solar installations in India (2026).

45%

Solar Pv Modules

High-efficiency Mono Perc and N-Type Topcon panels (540Wp–580Wp) with 25-year performance warranties.

20%

Solar Inverter

High-efficiency on-grid string inverter (>97% efficiency, dual Mppt, digital monitoring).

12%

Mounting Structures

Hot-dip galvanized iron (Gi) or anodized aluminum structures engineered to withstand 150 km/h wind loads.

13%

Balance of System (Bos)

UV-resistant DC/AC solar cables, Acdb & Dcdb distribution boxes with Spd surge protection, and earthing kits.

10%

Net Metering & Labor

Discom application liaisoning, electrical inspection certification, and bi-directional net meter synchronization.

2. Rooftop Solar Price & Subsidy Benchmark Matrix (1 kW to 10 kW)

Below is a detailed benchmark table for turnkey residential solar installations across India, calculated directly from active market price slabs and central assistance under PM Surya Ghar Muft Bijli Yojana:

System Size Daily Generation Gross System Cost PM Surya Ghar Subsidy Net Payable Cost Shadow-Free Roof Area
1 kW 3.7 – 4.2 units ₹60,000 – ₹69,000 ₹30,000 ₹30,000 – ₹39,000 100 sq ft
2 kW 7.3 – 8.4 units ₹1,14,000 – ₹1,30,000 ₹60,000 ₹54,000 – ₹70,000 200 sq ft
3 kW Most Popular for Homes 11 – 12.6 units ₹1,65,000 – ₹1,89,000 ₹78,000 ₹87,000 – ₹1,11,000 300 sq ft
4 kW 14.7 – 16.9 units ₹2,20,000 – ₹2,52,000 ₹78,000 ₹1,42,000 – ₹1,74,000 400 sq ft
5 kW 18.3 – 21.1 units ₹2,60,000 – ₹3,00,000 ₹78,000 ₹1,82,000 – ₹2,22,000 500 sq ft
8 kW 29.3 – 33.7 units ₹4,00,000 – ₹4,64,000 ₹78,000 ₹3,22,000 – ₹3,86,000 800 sq ft
10 kW 36.7 – 42.2 units ₹5,00,000 – ₹5,80,000 ₹78,000 ₹4,22,000 – ₹5,02,000 1,000 sq ft

3. State-by-State Solar Top-Up Subsidies and Tariff Economics

While the PM Surya Ghar central subsidy provides up to ₹78,000 across India, several progressive states offer supplementary state-level financial grants. In addition, state domestic electricity tariffs directly determine how quickly your solar panels achieve complete financial payback:

State / Union Territory State Scheme State Top-Up Benefit Combined 3 kW Subsidy Avg Discom Tariff
Assam Assam State Rooftop Solar Scheme (APDCL) ₹45,000 ₹1,30,800 ₹6.80/unit
Bihar Bihar State Rooftop Solar Top-Up Subsidy (BREDA) ₹20,000 ₹98,000 ₹7.50/unit
Chhattisgarh Creda Rooftop Solar State Subsidy ₹30,000 ₹1,08,000 ₹6.10/unit
Delhi Delhi Solar Policy 2024–2027 (Capital Subsidy + GBI) ₹30,000 + GBI ₹1,08,000 + GBI ₹6.80/unit
Goa Goa Grid-Connected Rooftop Solar Promotion Scheme 2026 (GEDA) ₹45,000 ₹1,23,000 ₹5.10/unit
Gujarat Surya Gujarat Yojana ₹20,000 ₹98,000 ₹5.80/unit
Jammu and Kashmir JAKEDA UT Rooftop Solar Subsidy ₹9,000 ₹94,800 ₹4.60/unit
Ladakh Ladakh UT Solar Subsidy (LREDA) ₹50,000 ₹1,35,800 ₹3.90/unit
Odisha Odisha Akshaya Shakti Bikash Yojana (OASBY / OREDA) ₹60,000 ₹1,38,000 ₹6.00/unit
Puducherry Puducherry UT Rooftop Solar Top-Up Scheme ₹27,000 ₹1,05,000 ₹4.50/unit
Rajasthan Mukhyamantri Nishulk Bijli Yojana Solar Top-Up ₹17,000 ₹95,000 ₹7.10/unit
Tamil Nadu Tamil Nadu State Solar Top-Up Scheme (TNGECL / TEDA) ₹22,000 ₹1,00,000 ₹6.50/unit
Uttar Pradesh UP State Solar Policy Top-Up Subsidy (UPNEDA) ₹30,000 ₹1,08,000 ₹7.20/unit
West Bengal WBSEDCL State Rooftop Solar Top-Up Scheme ₹15,000 ₹93,000 ₹7.30/unit

Combined 3 kW subsidy reflects the ₹78,000 central PM Surya Ghar grant plus applicable state top-ups. In Delhi, the Generation-Based Incentive (Gbi) pays ₹3.00/kWh directly onto monthly electricity bills for 5 years.

Discom tariff impact on payback: In higher-tariff states like Maharashtra (₹8.80/kWh) and Uttar Pradesh (₹7.20/kWh), a 3 kW system saves over ₹2,600 to ₹3,100 per month, recovering full capital investment in approximately 2.9 to 3.4 years. In lower-tariff regions, payback takes closer to 4.2 years, though higher solar irradiance helps offset lower unit rates.

4. Component Bill of Materials: Hardware Standards and Approved Modules

A residential rooftop solar power plant operates outdoors for over 25 years. Sourcing components that meet Ministry of New and Renewable Energy (Mnre) and Bureau of Indian Standards (Bis) specifications is vital for durability and subsidy release:

Module Manufacturer Technology Panel Wattage Efficiency Linear Warranty
Tata Power Solar (535W Mono Perc) Perc 535W 20.7% 25 Years Linear
Waaree (540W Mono Perc) Perc 540W 20.9% 25 Years Linear
Vikram Solar (540W Mono Perc) Perc 540W 20.8% 25 Years Linear
Adani Solar (545W Topcon) Topcon 545W 21.2% 25 Years Linear
Panasonic (545W Topcon) Topcon 545W 21.4% 25 Years Linear

Mono Perc vs. N-Type Topcon: Which module technology is right for your roof?

Mono Perc (Passivated Emitter and Rear Cell) panels (535Wp–545Wp, 20.5%–20.9% efficiency) remain the cost-effective benchmark for most residential roofs. Newer N-Type Topcon (Tunnel Oxide Passivated Contact) panels (545Wp–580Wp, 21.2%–22.5% efficiency) offer 1.5%–2.5% higher energy yield in extreme summer temperatures (42°C+ across North and Central India) and slower annual degradation (0.4% vs 0.55% per year), making them ideal where roof space is limited.

5. Low-Interest Solar Bank Loans: Zero Net Out-of-Pocket Financing

Under PM Surya Ghar, leading public sector banks offer collateral-free rooftop solar loans at concessional interest rates (7.0% to 7.4% per annum) with repayment tenures up to 10 years (120 months). Because monthly electricity bill savings exceed the loan Emi, your system produces a net positive monthly cashflow from day one:

Lending Bank Interest Rate (p.a.) Max Tenure Processing Fee Sample Emi (₹1 Lakh, 5 Yrs)
Sbi (Surya Ghar Loan) 7.00% 10 Years 0.5% ₹1,980/mo
Bank of Baroda 7.15% 10 Years 0.5% ₹1,987/mo
Punjab National Bank 7.25% 10 Years 0.5% ₹1,992/mo
Canara Bank 7.30% 10 Years 0.5% ₹1,994/mo
Union Bank of India 7.40% 10 Years 0.5% ₹1,999/mo
Hdfc Bank 8.50% 5 Years 1% ₹2,052/mo

Monthly Cashflow Example for a 3 kW Rooftop System

With an average net payable cost of approximately ₹87,000 to ₹1,11,000 after central subsidy, an Sbi or Bank of Baroda solar loan at 7.0% requires an Emi of approximately ₹1,720 to ₹2,190 per month on a 5-year tenure (or just ₹1,010 to ₹1,290 per month on a 10-year tenure). A 3 kW installation generates 360 to 420 electricity units monthly, saving ₹2,400 to ₹3,100 on utility bills. Homeowners retain a net financial surplus every month while building a clean energy asset that produces free electricity for decades.

6. Step-by-Step PM Surya Ghar Installation and Subsidy Disbursement Timeline

The Ministry of New and Renewable Energy has consolidated rooftop solar processing through the National Portal. Here is what happens from initial site survey to subsidy deposit in your bank account:

Step 1: Rooftop survey and sanctioned load check

An installer inspects your roof orientation (south-facing preferred), available shadow-free area (100 sq ft per kW), and confirms your current sanctioned electrical load on your latest electricity bill.

Step 2: National Portal registration and Discom technical approval

Submit your application on the official PM Surya Ghar National Portal (pmsuryaghar.gov.in) with your consumer number. Your local Discom issues Technical Feasibility Approval (TFA) confirming local transformer capacity.

Step 3: Empaneled vendor selection and work order

Select an empaneled vendor through the portal. Agree on the equipment specifications (Almm-listed modules and grid-tied inverter) and sign the standard installation contract.

Step 4: Turnkey civil, mechanical, and electrical installation

The vendor completes module mounting on hot-dip galvanized structures, mounts the string inverter, installs Acdb/Dcdb protection boxes, and constructs dedicated chemical earthing pits (typically takes 2 to 3 days).

Step 5: Discom joint inspection and bi-directional net meter synchronization

Discom field engineers inspect the installation for safety, replace your existing meter with a bi-directional net meter, and energize the synchronization link.

Step 6: Commissioning certificate and direct subsidy transfer (Dbt)

The vendor uploads the commissioning report and site photograph to the portal. After online verification, the central subsidy (up to ₹78,000) is deposited directly into your linked bank account via Direct Benefit Transfer (Dbt) within 30 days.

Official Government Portals: PM Surya Ghar National Portal (pmsuryaghar.gov.in) · Ministry of New and Renewable Energy (mnre.gov.in)

7. Pre-Installation Technical Checklist: 5 Essentials Before Signing a Quote

Before paying any advance or signing an installation agreement, verify these five engineering requirements with your solar contractor:

1. Almm listing for modules and domestic cell requirement

Ensure modules appear on the Ministry of New and Renewable Energy's Approved List of Models and Manufacturers (Almm) with domestic content requirement (Dcr) compliance for subsidy eligibility.

2. Hot-dip galvanized structure with minimum 80-micron coating

Verify that the mounting structure uses hot-dip galvanized iron (Gi) with an 80-micron zinc coating (or anodized aluminum) rated to withstand 150 km/h wind gusts without rusting.

3. Three dedicated chemical earthing pits with resistance below 5 ohms

Quality installations require separate earthing pits for module frames, inverter chassis, and lightning arresters, tested with an earth tester to confirm resistance under 5 ohms.

4. Dual Type-II Surge Protection Devices (Spd) in Acdb and Dcdb

Surge protection boxes safeguard your inverter against grid voltage spikes and atmospheric lightning transients, the leading cause of premature inverter failure.

5. Written commitment for Discom net-metering liaisoning

Ensure your quotation explicitly states that the vendor will handle all Discom paperwork, meter testing, and site synchronization until the net meter is fully energized.

8. PM Surya Ghar Muft Bijli Yojana: Official Central Subsidy Slabs

Under PM Surya Ghar Muft Bijli Yojana, the Ministry of New and Renewable Energy (Mnre) provides fixed financial assistance for residential households across all Indian states and Union Territories:

  • 1 kW Capacity: Flat ₹30,000 direct subsidy.
  • 2 kW Capacity: Flat ₹60,000 direct subsidy (₹30,000 per kW).
  • 3 kW Capacity & Above: Maximum fixed subsidy of ₹78,000 (₹60,000 for the first 2 kW + ₹18,000 for the 3rd kW).
  • Group Housing Societies / Rwas: ₹18,000 per kW for common area lighting and Ev charging stations, capped up to 500 kW.
Disbursement Workflow: Official Portal Submission: After selecting an empaneled installer through the National Portal (pmsuryaghar.gov.in), the vendor installs and commissions the plant. Following Discom net meter synchronization and online work completion certificate submission, the subsidy is directly credited (Dbt) into your bank account within 30 days.

9. System Architecture: On-Grid vs. Hybrid vs. Off-Grid Systems

On-Grid Solar (Grid-Tied)

Highest Roi • Central Subsidy Eligible

Directly synced with the utility grid via net metering. Daytime surplus power is exported to the grid, earning credits to offset night usage. Has the lowest capital cost and qualifies for Pm Surya Ghar subsidies.

Hybrid Solar Systems

Battery Backup • Grid Connected

Combines on-grid net metering with a Lithium-ion or tubular battery bank. Powers essential loads during utility blackouts while continuing to export excess power during standard grid operation. Costs approximately ₹40,000–₹70,000 more per 5 kWh battery storage.

Off-Grid Solar Systems

100% Independent • No Grid Required

Completely detached from the utility grid, relying exclusively on solar modules, charge controllers, and battery banks. Ideal for remote farmhouses or regions without dependable grid access. Note: Off-grid installations are not eligible for Pm Surya Ghar central subsidies.

10. Solar Generation and Monthly Savings for 3 kW Systems Across Major Indian Cities

Solar generation varies based on local sunlight hours (Peak Sun Hours). Based on annual solar irradiation figures compiled in our database, the table below shows expected daily generation, monthly generation, and monthly bill savings for a standard 3 kW system across major Indian cities:

City State Peak Sun Hours (PSH) Daily Units (3 kW) Monthly Units Monthly Bill Savings
Bhopal Madhya Pradesh 5.4 hrs 12.6 units ~378 units/mo ₹2,533/mo
Jaipur Rajasthan 5.4 hrs 12.6 units ~378 units/mo ₹2,684/mo
Ahmedabad Gujarat 5.2 hrs 12.2 units ~366 units/mo ₹2,123/mo
Pune Maharashtra 5.05 hrs 11.8 units ~354 units/mo ₹3,115/mo
Bangalore Karnataka 4.9 hrs 11.5 units ~345 units/mo ₹2,553/mo
Patna Bihar 4.9 hrs 11.5 units ~345 units/mo ₹2,588/mo
Lucknow Uttar Pradesh 4.85 hrs 11.3 units ~339 units/mo ₹2,441/mo
Mumbai Maharashtra 4.8 hrs 11.2 units ~336 units/mo ₹2,957/mo
Delhi Delhi 4.75 hrs 11.1 units ~333 units/mo ₹2,264/mo
Kolkata West Bengal 4.6 hrs 10.8 units ~324 units/mo ₹2,365/mo

Note: Monthly savings are calculated using the state's average domestic Discom tariff and a standard 78% performance ratio. Cities with high sunshine hours like Jaipur and Ahmedabad achieve full capital payback in under 3.2 years.

Plan your installation end-to-end: verify exact central and state subsidies on the Pm Surya Ghar Subsidy Calculator, calculate your payback period with the Solar Roi Calculator, or compare low-interest green loans on the Solar Loan Emi Calculator.

Continue planning

Solar Subsidy Calculator

Your exact Pm Surya Ghar amount, step by step.

→

Solar Roi Calculator

Payback period and 25-year savings.

→

Solar Loan Emi Calculator

Compare Emis across Sbi, Bank of Baroda, Pnb and more.

→

Pm Surya Ghar Yojana Calculator

Eligibility, documents and application steps.

→

On-Grid Solar System Calculator

Net-metering savings and payback from your bill.

→
Regional Solar Hubs

Explore Rooftop Solar by State & City

Calibrated with state Discom tariffs, local net-metering policies, and PM Surya Ghar subsidies across India.

Frequently asked questions

How much does a 3kW solar system cost in India in 2026?

A 3kW on-grid rooftop system typically costs ₹1.5–1.8 lakh before subsidy. After the ₹78,000 PM Surya Ghar central subsidy, the net cost comes to roughly ₹75,000–₹1 lakh depending on your state, brand and installer.

How is my system size calculated from my electricity bill?

We convert your bill to monthly units using your state's average tariff, then size the system so its generation (units per day = kW × sun hours × performance ratio) covers that usage. The result is rounded up to the nearest 0.5 kW.

What subsidy do I get under PM Surya Ghar Muft Bijli Yojana?

₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW — a maximum of ₹78,000 for systems of 3 kW or larger. It applies to residential consumers; some states add their own top-up on top of this.

Does a bigger bill always mean a bigger system?

Broadly yes — but the subsidy is capped at 3 kW, so beyond that each extra kW is at full price. Systems above 10 kW residential also need feasibility approval from your Discom in most states.

Are these prices exact quotes?

No — they are careful estimates from current market price slabs, updated regularly. Actual quotes vary by city, roof type, structure height and brand. Use the estimate to negotiate confidently with installers.

How much roof area do I need?

Plan roughly 100 sq ft of shadow-free roof per kW. A 3 kW system needs about 300 sq ft. The calculator shows the exact area for your recommended size.

What key factors affect total rooftop solar installation cost?

System scale (larger 5–10 kW systems have a lower ₹/Watt cost), module technology (Mono Perc vs premium Topcon/Bifacial), structure height (standard vs elevated Gi), and available central and state subsidies.

Are government subsidies deducted upfront by installers?

No. Installers quote the turnkey cost. Following installation, net meter connection, and Discom inspection, the PM Surya Ghar subsidy (up to ₹78,000) is deposited directly into your bank account via Direct Benefit Transfer (Dbt).

Can rooftop solar systems be financed through bank loans?

Yes. Major public sector banks like Sbi, Bank of Baroda, and Pnb offer collateral-free solar loans under PM Surya Ghar at low interest rates (7% to 9%) with repayment tenures up to 7–10 years.

Before you rely on this estimate

This calculator produces a planning range from your inputs and the assumptions shown on the page. It cannot replace a site visit, roof-shade survey, Discom approval or supplier quotation.

A calculator is not a quotation. A written quote should separately state the module and inverter model, mounting structure, protection equipment, taxes, net-metering work, warranty and completion timeline.

Next step: match the suggested capacity and budget against the written quote scope.

Check a solar quote →